Intelligent building full-life-cycle asset management system and method

An asset management system, a technology of the whole life cycle, applied in the direction of resources, data processing applications, electrical digital data processing, etc., can solve the problems of low efficiency of information flow, error-prone, low efficiency, etc., to achieve the benefits of asset management, effective management Effect

Pending Publication Date: 2022-01-11
南京智慧建筑研究院有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the existing technology, most of the smart building asset management methods rely on traditional manual management methods, and different departments are in charge of different assets.
This manual method of collecting and entering data is inefficient and error-prone on the one hand, and on the other hand, the efficiency of information flow is low. This problem needs to be solved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent building full-life-cycle asset management system and method
  • Intelligent building full-life-cycle asset management system and method
  • Intelligent building full-life-cycle asset management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] The invention discloses an asset management system for a full life cycle of a smart building, which includes a main control module, a client, a verification module, a detection module, a resource processing module and an index module.

[0034] Among them, the main control module is used for importing and exporting interfaces of resources, as well as creating and managing accounts, and granting different operation permissions to different created accounts. In this embodiment, the main control module needs to store a large amount of resource data, which is generally undertaken by the cloud server.

[0035] The accounts created by the main control module include administrators, sub-administrators and user group members, and different identities have different permissions. Among them, the administrator has the operation authority to create another administrator, create a user group, obtain user group information, obtain user group member information and task distribution; ...

Embodiment 2

[0044] The invention discloses a method for asset management in the whole life cycle of a smart building, which includes two operations of uploading resources and downloading resources.

[0045] Among them, when a user uploads a resource, the user receives an upload operation command, checks the security of the uploaded data, and if there is an exception, marks the abnormally detected file and pops up a window to prompt the user to reject the upload, and executes the next step if there is no exception;

[0046] Compress and encrypt the uploaded data, and record the sequence of decryption and decompression operations and the algorithm used according to the encryption and compression operations;

[0047] Add the operation of uploading files to the import and export logs, including the file name, operation account, operation times and operation time.

[0048] When the user downloads resources, obtain the download operation instruction, verify the security of the account, refuse t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a smart building full-life-cycle asset management system and method, relates to the technical field of smart buildings, and aims to solve the problems that a manual data collection and entry method is low in efficiency and easy to make mistakes, and meanwhile, the information circulation efficiency is low. According to the technical scheme, the system comprises a master control module; a client; a verification module, which is used for verifying the account information and querying the registration information; a detection module, which is used for detecting the security of imported and exported data; and a resource processing module, which is used for importing resources after compression and encryption and exporting files after decryption and decompression, and recording a decryption and decompression operation sequence and an adopted algorithm according to encryption and compression operations. Multi-party management of smart building assets is integrated, electronic resources are summarized to a platform for users to perform information exchange, and more effective management is realized for relatively huge and complicated data involved in the whole life cycle of the smart building.

Description

technical field [0001] The invention relates to the technical field of smart buildings, in particular to a system and method for asset management in the full life cycle of smart buildings. Background technique [0002] Smart building refers to providing users with an efficient, comfortable and convenient humanized building environment by optimizing the structure, system, service and management of the building according to the needs of users. Intelligent buildings are the product of the culmination of modern science and technology. Its technical foundation is mainly composed of modern building technology, modern computer technology, modern communication technology and modern control technology. Mainly for office buildings, commercial complex buildings, culture, media, schools, stadiums, hospitals, transportation, industrial buildings, residential quarters and other new construction, expansion or reconstruction projects, through the configuration of intelligent functions of b...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08G06F21/60
CPCG06Q10/0637G06Q50/08G06F21/602G06F2221/2141G06F2221/2107
Inventor 王建杰
Owner 南京智慧建筑研究院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products