Subway station foundation pit temporary component full-recovery supporting system and construction method
A subway station, full recycling technology, applied in infrastructure engineering, excavation, artificial islands, etc., can solve problems such as high carbon emissions, shortage, material waste, etc., and achieve the effects of reducing difficulty, improving safety, and facilitating recycling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] This embodiment provides a full recovery support system for the temporary components of the foundation pit of the subway station, especially suitable for suburban subway stations, such as figure 1 , figure 2 and Figure 4 As shown, including the purlin 3 and the composite pile 4, the purlin 3 and the composite pile 4 are arranged on the outside of the end well 2 at both ends of the subway station 1, wherein the purlin 3 is arranged on the inside of the composite pile 4, and the composite pile 4 is arranged on the retaining The inner side of the earth wall 5 is in contact with the earth retaining wall 5 to share the earth pressure, which can reduce the thickness of the earth retaining wall 5 and save resources.
[0035] Further, such as figure 2 As shown, the composite pile 4 includes a steel pipe pile 4.1, a steel sheet pile 4.2 and a connecting member 4.3, wherein the steel pipe pile 4.1 and the steel sheet pile 4.2 are arranged alternately, and the two sides of th...
Embodiment 2
[0044] This embodiment provides a construction method for the full recovery support system of the temporary components of the foundation pit of the subway station. The full recovery support system of the temporary components of the foundation pit of the subway station adopts the structure described in Embodiment 1, including the following steps:
[0045] Step 1: According to the soil conditions around the foundation pit of the end well of the subway station, the numerical simulation method is used to establish the composite pile model; and the deformation of the composite pile is calculated in combination with deformation compensation to obtain the inclination angle of the composite pile. According to the construction conditions of the foundation pit, determine the model of the composite pile, the length of the pile, the number and distribution scheme of the steel purlins and steel supports.
[0046] Since the construction envelope of the subway station is usually designed as a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com