Curbstone back plain concrete efficient construction method
A construction method and technology of curbstone, applied in the direction of gutter/curb, roads, roads, etc., can solve the problems of low construction efficiency of wood formwork, achieve high construction efficiency, save materials and costs, and improve the effect of versatility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0040] The application discloses a high-efficiency construction method for plain concrete behind curb stones. refer to figure 1 A high-efficiency construction method for plain concrete behind curbs includes construction tools, and the construction tools include a fixed frame 1. A sliding assembly 2 is arranged on the fixed frame 1, and the sliding assembly 2 is slidably connected with the curb 6, so that the fixed frame 1 can move along the The curb 6 slides in the length direction. A formwork 5 is also provided on the fixed frame 1, and a pouring area is formed between the formwork 5 and the curb stone 6, which is convenient for pouring concrete. A first adjustment assembly 3 and a second adjustment assembly 4 are arranged between the fixed frame 1 and the template 5, the first adjustment assembly 3 is used to adjust the distance between the template 5 and the fixed frame 1, and the second adjustment assembly 4 is used to adjust The height of the template 5. During work, t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com