Tunnel passing through active fault and calculation method for length of fortification extension section of tunnel passing through the active fault
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] see figure 1 The tunnel crossing the active fault in this embodiment includes the railway line 1 before the fault dislocation, the railway line 2 after the fault dislocation, and the railway line 3 after the fault dislocation, and the railway line 2 after the fault dislocation is located on the active fault. Crossing Zone 4. The active fault crossing area 4 includes a fortification extension section 41, a fault fragmentation zone 42 and a fortification extension section 43 connected sequentially along the extension direction of the tunnel. The length of the fortification extension section 41 is L2, and the length of the fortification extension section 43 is L3. When the core part is evenly shifted, the lengths of the fortification extension section 41 and the fortification extension section 43 are equal, that is, L2=L3.
[0018] The fortification extension section 41 is calculated according to Formula 1: L2≥(L-L1) / 2 (Formula 1).
[0019] In Formula 1, L is the length ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com