A Construction Method for Protecting Municipal Pipelines
A construction method and technology of municipal pipelines, applied in the field of road construction, can solve problems affecting construction progress, short circuits, hidden safety hazards, etc., and achieve the effects of improving construction efficiency, avoiding short circuits, and improving safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Embodiment 1, as figure 1 , figure 2 As shown, the construction method of the protection municipal pipeline in the present embodiment comprises the following steps:
[0029] S1. Manually excavate the detection trench along the width direction of the construction road at one end of the construction road section, find the municipal pipeline in the detection trench and determine the length direction and height position of the municipal pipeline;
[0030] S2, mark the municipal pipeline length laying area of the construction road section along the length direction of the municipal pipeline on the surface of the construction road section; the width of the municipal pipeline length laying area is 30cm;
[0031] S3. Use excavation equipment to dig a construction channel along the length direction of the municipal pipeline on the side of the municipal pipeline length laying area; the distance between the construction channel and the municipal pipeline length laying area is ...
Embodiment 2
[0037] Embodiment 2, as figure 1 , figure 2 As shown, the construction method of the protection municipal pipeline in the present embodiment comprises the following steps:
[0038] S1. Manually excavate the detection trench along the width direction of the construction road at one end of the construction road section, find the municipal pipeline in the detection trench and determine the length direction and height position of the municipal pipeline;
[0039] S2, mark the municipal pipeline length laying area of the construction road section along the length direction of the municipal pipeline on the surface of the construction road section; the width of the municipal pipeline length laying area is 35cm;
[0040] S3. Use excavation equipment to dig a construction channel along the length direction of the municipal pipeline on the side of the municipal pipeline length laying area; the distance between the construction channel and the municipal pipeline length laying area is ...
Embodiment 3
[0046] Embodiment 3, as figure 1 , figure 2 As shown, the construction method of the protection municipal pipeline in the present embodiment comprises the following steps:
[0047] S1. Manually excavate the detection trench along the width direction of the construction road at one end of the construction road section, find the municipal pipeline in the detection trench and determine the length direction and height position of the municipal pipeline;
[0048] S2, mark the municipal pipeline length laying area of the construction road section along the length direction of the municipal pipeline on the surface of the construction road section; the width of the municipal pipeline length laying area is 40cm;
[0049] S3. Use excavation equipment to dig a construction channel along the length direction of the municipal pipeline on the side of the municipal pipeline length laying area; the distance between the construction channel and the municipal pipeline length laying area is ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com