Construction method for shield crossing of densely-punched holes in lonestone and boulder stratums
A construction method and boulder technology, applied in earth cube drilling, mining equipment, mining equipment, etc., can solve problems such as lack of research and construction difficulties
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0021] According to an embodiment of the present invention, the step S1) uses the seismic scattered wave detection method to detect the situation of boulders and boulders in the remaining line stratum, including: arranging detection wires at predetermined distances on the surface of the remaining line; A plurality of signal sensors connected to the signal receiving and processing instruments are arranged on a detection wire; a percussion hammer connected to the signal receiving and processing instruments is used to tap the ground at each sensor position in order to generate seismic scattering waves, and the seismic waves are transmitted through the sensors and wires. The scattered wave is fed back to the terminal signal receiving and processing instrument; through the vibration frequency of each sensor position obtained by the terminal signal receiving and processing instrument, the distribution map of boulders and boulders on the remaining line is obtained.
[0022] The termin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com