Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Transportation scheduling management method for vehicle loading small containers

A scheduling management and vehicle scheduling technology, applied in data processing applications, instruments, computing, etc., can solve problems such as difficulty in later information query, inability to provide effective data support for operation and management decisions, and low vehicle scheduling efficiency.

Active Publication Date: 2019-12-27
山东宇佳物流有限公司
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. After the vehicles are packed at the site, a notice will be issued in the WeChat group, and the dispatcher will allocate the vehicles by telephone according to the information in the group. Due to the lack of real-time information on vehicles and containers, the efficiency of vehicle dispatching is low;
[0005] 2. In the process of transportation scheduling, there is a lack of container loading information, location information, integrity information, utilization rate and other information, as well as vehicle-related statistics, which cannot provide effective data support for operation and management decisions;
[0006] 3. Report container damage by uploading photos. Due to the complexity of the information in the group and the continuous update of information, it is very difficult to obtain and count damage information and query later information.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transportation scheduling management method for vehicle loading small containers
  • Transportation scheduling management method for vehicle loading small containers

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0079] combined with figure 1 , this embodiment proposes a vehicle transportation scheduling management method loaded with small containers, and the implementation content of the scheduling management method includes:

[0080] Load multiple pieces of goods belonging to the same transportation route at the same station into the same small container;

[0081] According to the station vehicle scheduling information and the information of the goods loaded in the small containers in the station, the small containers are dispatched, loaded and unloaded, and the station vehicle scheduling information is updated in real time;

[0082] Get information about just unloaded small containers,

[0083] When the newly unloaded small container does not contain the goods that need to be returned, unload the goods at the designated location according to the information of the just unloaded small container,

[0084] When the just-unloaded small container contains goods that need to be returned...

Embodiment 2

[0121] Based on Embodiment 1, this embodiment proposes a dispatch management method for vehicle transportation loaded with small containers. In the dispatch management method, the client involved is an application program deployed on a PC, or an APP deployed on a mobile terminal, or deployed on a WeChat applet.

[0122] In order to realize the scheduling management method described in the embodiment, in combination with the attached figure 2 , the clients involved include:

[0123] Role login module 1, used for login of personnel with different roles, including site administrator A, site operator B, return loader C, dispatcher D, vehicle driver E, forklift driver F, unloading operator G;

[0124] Management and editing module 2, after the site administrator A logs in through the role login module 1, it is used to edit the login rights and site information of personnel with different roles, and at the same time, it is used to view site information in real time;

[0125] Bin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a transportation scheduling management method for a vehicle loading small containers, relates to the technical field of vehicle scheduling, and adopts the scheme that the method comprises the following steps: loading a plurality of cargoes belonging to the same transportation line in the same station into the same small container; dispatching, loading and unloading the small containers according to the station vehicle dispatching information and the information of the goods loaded by the small containers in the stations, and updating the station vehicle dispatching information in real time; acquiring information of the just-unloaded small container; when the small container does not return goods, carrying out unloading at the designated position according to the information of the small containers; when return goods exist in the small containers, carrying out vehicle dispatching and loading on the small containers again, and updating station vehicle dispatchinginformation in real time; and when the small containers reach the destinations of the return goods, carrying out unloading at the designated position again according to the information of the small containers. According to the method, the visualization of vehicle scheduling can be realized, the waiting time of vehicles in the loading and unloading process is reduced, and the transportation efficiency is improved.

Description

technical field [0001] The invention relates to vehicle scheduling, in particular to a vehicle transportation scheduling management method loaded with small containers. Background technique [0002] With the increasingly active international trade, containerized transportation has gradually become the main means of logistics transportation in the world, and the transportation scheduling of containers has also become very flexible. [0003] At present, the container transportation scheduling method usually has the following problems: [0004] 1. After the vehicles are packed at the site, a notice will be issued in the WeChat group, and the dispatcher will allocate the vehicles by telephone according to the information in the group. Due to the lack of real-time information on vehicles and containers, the efficiency of vehicle dispatching is low; [0005] 2. In the process of transportation scheduling, there is a lack of container loading information, location information, int...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/08G06Q10/06
CPCG06Q10/083G06Q10/06312
Inventor 陈建华李兴保
Owner 山东宇佳物流有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products