Project cost management system based on big data

A technology of engineering cost and management system, which is applied in data processing applications, market forecasting, instruments, etc., and can solve problems such as poor accuracy of engineering project costs

Active Publication Date: 2019-12-24
金润方舟科技股份有限公司
View PDF11 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a project cost management system based on big data, which solves the problem of poor accuracy of project cost existing in the process of existing project cost management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project cost management system based on big data

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0042] see figure 1 As shown, a project cost management system based on big data, including project classification module, distributed database, construction decision analysis module, project screening and matching module, resource scheduling module, management server and service statistics module;

[0043] The engineering classification module is connected to the distributed database, the management server is connected to the construction decision analysis module,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project cost management system based on big data. The project cost management system comprises a distributed database, a construction decision analysis module, a project screening and matching module, a resource scheduling module, a management server and a service statistics module, wherein the management server is respectively connected with the construction decision analysis module, the project screening and matching module, the distributed database and the resource scheduling module, and the resource scheduling module is respectively connected with the project screening and matching module and the service statistics module. According to the invention, the construction decision analysis module, the project screening and matching module, the resource scheduling module and the service analysis module are combined with the management server, the completed engineering project with the maximum coincidence degree coefficient with the inputted project engineering is screened, and the process prediction difficulty coefficient and the prediction comprehensive engineering difficulty coefficient corresponding to each construction process in the inputted project engineering are counted to obtain the engineering cost corresponding to the engineering project, so that the accuracy of the engineering cost statistics is improved, and the stable and high-speed development of the building industry is promoted.

Description

technical field [0001] The invention belongs to the technical field of engineering cost management, and relates to a big data-based engineering cost management system. Background technique [0002] The project cost refers to the construction price of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project. With the continuous advancement of my country's economic construction, it has greatly promoted the vigorous development of urban construction. In the process of engineering construction, because the project construction itself is a complicated implementation process, the general investment is relatively large, and the actual construction period is relatively long. At the same time, in the process of project implementation, cooperation from many aspects is required, which increases the cost management of multi-projects. Therefore, before the completion of the entire project, it is impossible to obtain the ac...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q30/02G06Q50/08
CPCG06Q10/06393G06Q30/0206G06Q50/08
Inventor 邓嘉明
Owner 金润方舟科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products