Red sandstone layer waterproof spraying anchor support method and waterproof device
A shotcrete support and water-proof technology, applied in excavation, construction, infrastructure engineering, etc., can solve the problems of bulging, cracks, and difficulty in supporting the supporting surface, so as to control settlement and deformation, ensure safety, and ensure strength. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as figure 1 As shown, a water-isolating device for a method for supporting a red sandstone layer with water-isolating spray anchors includes a plastic sheet 1, which is vertically installed on the rock wall between the supporting piles, and the plastic sheet 1 is externally fixedly installed Reinforced frame 2, steel frame 2 is externally fixedly installed with straw curtain 3, and externally fixedly installed with steel mesh 4.
[0025] A method for supporting a red sandstone layer with water-proof spraying and anchoring includes the following steps:
[0026] a. After the construction of supporting piles for the foundation pit, the soil between the piles is excavated in vertical layers and horizontal sections. The excavation height of each layer is 2m below the last supporting surface, and the length of the horizontal section is based on the site construction Speed is determined;
[0027] b. After vertical layering and horizontal section excavation, excavate the exca...
Embodiment 2
[0031] Such as figure 1 As shown, a water-isolating device of a red sandstone layer water-isolating spray anchor support method includes a plastic sheet 1, which is vertically installed on the rock wall between piles of supporting piles, and the plastic sheet 1 is fixed externally The steel frame 2, the steel frame 2 is externally fixedly installed with a grass curtain 3, and the grass curtain 3 is externally fixed with a steel mesh 4.
[0032] A method for supporting a red sandstone layer with water-proof spraying and anchoring includes the following steps:
[0033] a. After the construction of supporting piles for the foundation pit, the soil between the piles is excavated in vertical layers and horizontal sections. The excavation height of each layer is 1.5m from the last support surface, and the horizontal section length is based on Confirmation of site construction speed;
[0034] b. After vertical layering and horizontal section excavation, excavate the excavation surface per...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com