Slurry for SCAP (slurry, cake, air, pressure) type earth pressure balance shield bulk breaking and preparation method of slurry
A technology of earth pressure balance shield tunneling and preparation method, which is applied to earth square drilling, mining equipment, tunnels, etc., and can solve the problems of expensive mud for opening cabins, complicated preparation, and foreign transportation of muck, and achieves a simple and easy preparation method line, reduce environmental pollution, cost-effective effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0031] SCAP-type earth pressure balance shield opening mud preparation includes the following raw materials per cubic meter: 186kg of waste silt, 821kg of clear water, 274kg of calcium-based bentonite, 10.9kg of modifier, 2kg of viscosifier (including sodium carboxymethyl cellulose 1.6kg and polyacrylamide 0.4kg), the above raw materials are placed in a mud truck and mixed evenly for use.
[0032] The quality control index of the mud used for opening the cabin prepared in this embodiment is as follows: the density is 1.29g / cm3, and the viscosity value of the Martens funnel is 80s, which meets the engineering construction requirements.
Embodiment 2
[0034] Per cubic meter of gravel formation, the preparation of mud for pressure opening includes the following raw materials: 114kg of waste silt, 902kg of clear water, 227kg of calcium-based bentonite, 9.05kg of modifier and 0.6kg of viscosifier (wherein sodium carboxymethyl cellulose is 0.5kg and polyacrylamide 0.1kg), put the above raw materials in a mud truck and mix them evenly for use.
[0035] The quality control index of the mud for opening the cabin prepared by the present embodiment is: the density is at 1.25g / cm 3 , The Marsh funnel viscosity value is 67s, which meets the engineering construction requirements.
Embodiment 3
[0037] The preparation method of the slurry for opening the cabin of the SCAP type earth pressure balance shield comprises the following steps:
[0038] S1. Dry the waste silt produced when the shield tunneling into the silt or silty clay layer.
[0039] S2. Sieve the dried silt with a mesh size of 0.25 mm, and store the silt that has been sieved for subsequent use.
[0040] S3. When the shield machine needs to be opened under pressure, add silt, clear water, calcium-based bentonite, modifier and tackifier to the mud truck, specifically add 65 parts of silt, 500 parts of clear water, calcium Base bentonite 120 parts, modifier 4 parts, tackifier 1 part. Stir continuously at room temperature, the stirring speed is first fast and then slow, until the stirring is uniform.
[0041] S4. After uniform stirring for 6 hours, test the density and viscosity of the mixture in the mud truck, and the density of the mud is 1.28g / cm 3 , the Marsh funnel viscosity value is 75s, which meets ...
PUM
Property | Measurement | Unit |
---|---|---|
Density | aaaaa | aaaaa |
Density | aaaaa | aaaaa |
Density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com