A kind of preparation method of mesophase pitch
A mesophase pitch and asphalt technology, which is applied in the field of mesophase pitch preparation, can solve the problems of unfavorable high purification of mesophase pitch, and achieve the effects of low cost, simple production and high safety factor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] Take 650 kg of petroleum asphalt with a softening point of 85°C and an ash content of 100ppm, take 50 kg of additives with a softening point of 160°C, and put them into a 1000L reactor, the reaction temperature is 420°C, the reaction time is 2 hours, and the temperature is lowered to 360°C. Hours, 94.6% isotropic asphalt in the upper layer and 5.4% anisotropic asphalt in the lower layer are obtained, and the isotropic asphalt in the lower layer is discharged, the reaction temperature is raised to 410°C, and the reaction is performed for 10 hours to obtain a mesophase content of 100% and a softening point of 271°C , mesophase pitch with an ash content of 78ppm.
Embodiment 2
[0026] Take 650 kg of petroleum asphalt with a softening point of 85°C and an ash content of 100ppm, take 50 kg of additives with a softening point of 160°C, put them into a 1000L reactor, and set the reaction temperature at 420°C for 5 hours, cool down to 360°C, and settle for 2 Hours, 88.7% isotropic asphalt in the upper layer and 11.3% anisotropic asphalt in the lower layer are obtained, and the isotropic asphalt in the lower layer is discharged, the reaction temperature is raised to 410°C, and the reaction is performed for 10 hours to obtain a mesophase content of 100% and a softening point of 272°C , mesophase pitch with an ash content of 59ppm.
Embodiment 3
[0028] Take 650 kg of petroleum asphalt with a softening point of 85°C and an ash content of 100ppm, take 50 kg of additives with a softening point of 160°C, put them into a 1000L reactor, and set the reaction temperature at 420°C for 10 hours, then cool down to 360°C and settle for 2 Hours, 81.2% isotropic asphalt in the upper layer and 18.8% anisotropic asphalt in the lower layer are obtained, and the isotropic asphalt in the lower layer is discharged, and the reaction temperature is raised to 410°C for 10 hours to obtain a mesophase content of 100% and a softening point of 275°C , mesophase pitch with an ash content of 45ppm.
PUM
Property | Measurement | Unit |
---|---|---|
softening point | aaaaa | aaaaa |
softening point | aaaaa | aaaaa |
softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com