Preparation method of newly-constructed taphole duct
A technology of tapholes and tunnels, which is applied in the field of preparation of tunnels for new masonry tapholes, can solve problems such as sputtering of tapholes in newly opened furnaces, and achieve the effects of ensuring accuracy, high compactness, and solving sputtering of tapholes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0020] A method for preparing a new masonry tunnel, comprising the following steps:
[0021] 1) Use compressed air to clean the reserved hole of the newly built iron hole channel;
[0022] 2) The wall of the iron mouth ceramic cup in the hearth is sealed with a 15mm-25mm thick pouring template;
[0023] 3) Use corundum aluminum castables with a refractoriness ≥ 1500°C to cast the reserved holes of the tap hole at one time, and use a vibrating rod to vibrate the air bubbles in the refractory castables, and the vibration time is 1min-2min;
[0024] 4) Natural drying for 24h-36h, no contact with water vapor during the drying period;
[0025] 5) Determine the position of the center line of the iron hole, and use a drilling machine to drill the castable material with the same diameter as the hole in the hole to form the hole in the hole.
Embodiment
[0027] New blast furnace, the diameter of the hole reserved for the tap hole is 300mm, and the diameter of the tap hole is 80mm.
[0028] A method for preparing a new masonry tunnel, comprising the following steps:
[0029] 1) Use compressed air to clean the reserved hole of the newly built iron mouth channel to ensure that it is clean and free from dust.
[0030] 2) The wall of the iron mouth ceramic cup in the hearth is sealed with a 20mm thick pouring formwork to ensure tightness.
[0031] 3) Stir the high-quality iron trench castable evenly for 5 minutes, pour the reserved holes of the iron gate channel at one time, and vibrate the bubbles of the castable with a vibrating rod for 1 minute to ensure the compactness.
[0032] 4) Naturally dry for 24 hours, and ensure that it cannot be exposed to water vapor during the period.
[0033] 5) Set the opening at the center line of the iron mouth, and use a drill bit with a diameter of 80mm to drill holes in the channel castable ...
PUM
Property | Measurement | Unit |
---|---|---|
flame retardant | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com