Construction method for sandstone layer long expansion body high-strength single-reinforcement anti-floating anchor rod
A technology of anti-floating anchor rod and construction method, which is applied in the direction of infrastructure engineering, sheet pile wall, protection device, etc. The effect of reducing the number of bolts, improving the pullout resistance and increasing the anti-floating effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] The construction method of the long-expanded high-strength single-reinforcement anti-floating bolt in the sandstone layer includes the following steps:
[0027] 1) Anchor hole forming: After the foundation pit is excavated to the designed cushion bottom elevation, the counter-floating anchor is positioned before the cushion construction, the anchor hole position is reserved, the cushion construction is carried out immediately, and the weathered sandstone layer is closed in time. After the concrete is hardened, the anti-floating anchor construction is carried out; during construction, the total length of the anchor is 12.0m, and the anchor is anchored into the raft 0.7m. According to the design requirements, during construction, the upper part uses the HM90 crawler drilling rig to form the hole, and the lower part uses the XL50B reaming drilling rig The hole is formed and entered into the sandstone layer, so that the diameter of the reaming part reaches 400mm, the steel c...
Embodiment 2
[0031] The construction method of the long-expanded high-strength single-reinforcement anti-floating bolt in the sandstone layer includes the following steps:
[0032] 1) Anchor hole forming: After the foundation pit is excavated to the designed cushion bottom elevation, the counter-floating anchor is positioned before the cushion construction, the anchor hole position is reserved, the cushion construction is carried out immediately, and the weathered sandstone layer is closed in time. After the concrete is hardened, the anti-floating anchor construction is carried out; during construction, the total length of the anchor is 12.0m, and the anchor is anchored into the raft 0.7m. According to the design requirements, during construction, the upper part uses the HM90 crawler drilling rig to form the hole, and the lower part uses the XL50B reaming drilling rig The hole is formed and entered into the sandstone layer, so that the diameter of the reaming part reaches 400mm, the steel c...
Embodiment 3
[0036] The construction method of the long-expanded high-strength single-reinforcement anti-floating bolt in the sandstone layer includes the following steps:
[0037] 1) Anchor hole forming: After the foundation pit is excavated to the designed cushion bottom elevation, the counter-floating anchor is positioned before the cushion construction, the anchor hole position is reserved, the cushion construction is carried out immediately, and the weathered sandstone layer is closed in time. After the concrete is hardened, the anti-floating anchor construction is carried out; during construction, the total length of the anchor is 12.0m, and the anchor is anchored into the raft 0.7m. According to the design requirements, during construction, the upper part uses the HM90 crawler drilling rig to form the hole, and the lower part uses the XL50B reaming drilling rig The hole is formed and entered into the sandstone layer, so that the diameter of the reaming part reaches 400mm, the steel c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com