Method and system for calculating leakage amount based on DMA zoning flow
A flow calculation and leakage technology, which is applied in the direction of calculation, complex mathematical operation, design optimization/simulation, etc. It can solve the problem of unscientific and unscientific determination of the minimum flow time period at night, so as to avoid differences in leakage data, Avoid biased results and enhance accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] In order to calculate the leakage more accurately, please refer to figure 1 , figure 1 It is a flowchart of a method for calculating leakage based on DMA partition traffic provided by the present invention. Such as figure 1 As shown, the present invention provides a method for calculating leakage based on DMA partition traffic, including:
[0032] S1: Install a flow meter at the inflow point of the DMA partition, and set the flow meter data upload interval;
[0033] S2: Upload the sampling data of the flowmeter to the SCADA system in real time, and then the water supply management system calls the sampling data in the SCADA system, and stores the sampling data in the database of the water supply management system;
[0034] S3: Obtain all sampling data within one month, and calculate the first flow data of this time period based on 30 minutes;
[0035] S4: According to the first flow data, calculate the first average value u1 and the first standard deviation σ1 of al...
Embodiment 2
[0047] See figure 2 , figure 2 It is a flow chart of another method for calculating leakage based on DMA partition traffic provided by the present invention. Such as figure 2 As shown, the present invention provides a method for calculating leakage based on DMA partition traffic, including:
[0048] S1: Install a flow meter at the inflow point of the DMA partition, set the flow meter data upload interval, and the interval is less than 10 minutes;
[0049] S2: Upload the sampling data of the flowmeter to the SCADA system in real time, and then the water supply management system calls the sampling data in the SCADA system, and stores the sampling data in the database of the water supply management system;
[0050] S3: Obtain all sampling data within one month, and calculate the first flow data of this time period based on 30 minutes;
[0051] S4: According to the first flow data, calculate the first average value u1 and the first standard deviation σ1 of all the first flo...
Embodiment 3
[0068] See image 3 , image 3 It is a structural diagram of a system for calculating leakage based on DMA partition traffic provided by an embodiment of the present invention. Such as image 3 As shown, the present embodiment provides a system for calculating leakage based on DMA partition flow, including: DMA system 1, SCADA system 2 and water supply management system 3, DMA system 1, water supply management system 3 and SCADA system 2 respectively connect.
[0069] DMA system 1 divides the area to be measured into multiple DMA partitions; the inflow point of the DMA partition is connected to the flowmeter, and the flowmeter uploads the sampling data to the SCADA system in real time according to the preset interval time, and the preset interval time is less than 10 minutes.
[0070] The water supply management system 3 includes a database 30, a first calculation module 31, a second calculation module 32, a data elimination module 33, a determination module 34, a third cal...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com