Clock tester and clock test method for distribution terminals

A clock tester and power distribution terminal technology, applied in the direction of electrical components, pulse technology, etc., can solve the problems of reducing the accuracy of clock testing and achieve the effect of improving accuracy

Inactive Publication Date: 2019-01-25
YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] This application provides a clock tester and a clock test method for power distribution terminals, which can be used to solve the problem that the clock test of each power distribution terminal is based on the different time of each power distribution terminal due to the different time of each power distribution terminal , which reduces the accuracy of the clock test problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Clock tester and clock test method for distribution terminals
  • Clock tester and clock test method for distribution terminals

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] In order to enable those skilled in the art to better understand the technical solutions in the embodiments of the present application, and to make the above-mentioned purposes, features and advantages of the embodiments of the present application more obvious and understandable, the technical solutions in the embodiments of the present application are described below in conjunction with the accompanying drawings The program is described in further detail.

[0048] An embodiment of the present application provides a clock tester for a power distribution terminal. The clock tester is a device independent of the power distribution terminal and can be used for clock testing of the power distribution terminal. Please refer to figure 1 , which shows a schematic structural diagram of a clock tester. The clock tester 100 includes: a digital processing module 101 , a clock module 102 , a Global Positioning System (Global Positioning System, GPS) module 103 , a communication mo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a clock tester and a clock test method of a distribution terminal. The clock tester comprises a digital processing module, a clock module, a GPS module, a communication moduleand an input / output module. The digital processing module is electrically connected with the clock module, the GPS module, the communication module and the input / output module, and the clock module iselectrically connected with the GPS module. The clock module is used for: acquiring the GPS second pulse signal generated by the GPS module; According to the GPS second pulse signal, the crystal oscillator is tamed to obtain the clock signal. Timing the distribution terminal according to the clock signal and the GPS second pulse signal; The digital processing module is used for performing clock test on the time-given distribution terminal through the communication module and / or the in / out module. The clock tester provided by the present application enables the distribution terminal and the clock tester to coincide in time by timing the distribution terminal, so that the clock test is carried out based on the time of the same clock tester, and the accuracy of the clock test is improved.

Description

technical field [0001] The present application relates to the testing field of power distribution terminals, in particular to a clock tester and a clock testing method for power distribution terminals. Background technique [0002] The power distribution terminal is the basic equipment for power distribution automation. It is used to realize the monitoring and data collection of power distribution network equipment. functions such as positioning and recovery. [0003] At each stage of the construction and implementation of the distribution network, all kinds of distribution terminals need to carry out clock tests related to Sequence Of Event (SOE) events, remote signaling response time, and remote control response time. Since the respective clocks of each power distribution terminal in the power distribution network are not the same, the time of each power distribution terminal is also different. The clock test is based on the time of the power distribution terminals. Sinc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H03K21/40
CPCH03K21/40
Inventor 曹敏刘柱揆李文云王洪林许守东刘红文李维邵方冰练雄杨立超赵现平王科黄星
Owner YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products