A high bridge pier preloading device with high-altitude combined pressure and a construction method thereof
A construction method and technology for bridge piers, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of large equipment requirements, large safety risks, and large workload, and achieve high loading efficiency, good safety, and fast speed. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0034] Such as Figures 1 to 5 As shown, a high-altitude combined ballast high pier preloading device of the present invention, the high pier preloading device is symmetrically arranged on both sides of the pier 7, including an upper anchor system 1, a lower anchor system 2, a bracket 5, and a steel strand The line system 9, the upper anchor system 1 is set on the distribution beam 6 above the bracket 5 and is perpendicular to the distribution beam 6, the lower anchor system 2 is located below the bracket 5 and connected with the platform 4, the upper anchor system 1 and the lower anchor system 2. Connected by the steel strand system 9, the high pier preloading device also includes load-bearing steel parts 8, which are located on both sides of the upper anchor system 1 and vertically arranged with the distribution beam 6, and the uppe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com