[0017] Refer to attached figure 1 , this embodiment provides a construction method for entering a shaft directly above the main line of a subway section. The process is as follows: construction of the ring beam at the lock mouth of the shaft → installation of hoisting equipment → earth and stone excavation → support of the shaft wall → treatment of the horse head door → temporary guide Pit construction → middle pilot tunnel construction → construction of left line expansion excavation section.
[0018] The specific construction method is as follows:
[0019] Right above the main line of the subway section, select a suitable location to set up a shaft according to the structural form and geological conditions of the tunnel. Before the construction of the shaft, the construction of the lock ring beam is carried out first, the steel bars are tied on site, and the C25 lock ring beam concrete is poured with the supporting steel formwork. After the construction of the lock ring bea...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com