Polymer grouting construction technology
A construction technology, high polymer technology, applied in the field of high polymer grouting construction technology, can solve the problems of long curing time, inconvenient traffic, etc., and achieve the effects of small traffic impact, stable performance, and controllable grouting volume
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] A high polymer grouting construction process, which controls traffic on the grouted road surface, marks the position of the grouting hole, conducts pre-grouting inspection, lowers the grouting pipe after the drilling is completed, and installs the grouting cap, and the polymer passes through the grouting The grout pipe is transported to the grouting road surface, the grouting pressure is controlled, and the pressure is maintained until the polymer is solidified. After the inspection, the holes are sealed, the environment is cleaned and the traffic is opened.
[0018] The grouting holes are arranged along the driving direction, the diameter of the grouting holes is 16mm, the longitudinal spacing of the grouting holes is 1.5m, and the lateral spacing of the grouting holes is 1.25m. In case of pavement cracks, add grouting holes on both sides of the cracks. The distance between the grouting holes is 0.3m from the cracks, and the distance along the cracks is 1.2m.
[0019] ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com