Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Assembly type concrete beam plate and installation and maintenance method

An installation method and concrete technology, applied in bridge maintenance, bridges, bridge parts, etc., can solve the problems of large manpower, low cost, troublesome repairs, etc.

Pending Publication Date: 2018-10-09
JSTI GRP CO LTD +1
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, cement concrete pavement has low cost, good wear resistance, and is suitable for heavy-duty traffic, but the curing period is long, and it is troublesome to repair in the future; asphalt concrete pavement is light in weight, easy to maintain and open to traffic, but it is easy to age and deform.
Asphalt surface treatment and mud-bound macadam pavement, poor durability
Regardless of whether cement concrete or asphalt concrete is used for bridge deck pavement, after it is damaged, it needs to be restricted to traffic, and the damaged area needs to be cut and chiseled, and then poured and maintained, which takes a long time and money
And the pavement of the bridge deck also needs to consume a lot of manpower and material costs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Assembly type concrete beam plate and installation and maintenance method
  • Assembly type concrete beam plate and installation and maintenance method
  • Assembly type concrete beam plate and installation and maintenance method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] Such as Figure 1~6 Shown is the structural representation of the assembled concrete beam slab and each component of the present invention, including

[0038] Prefabricated bridge deck 1, beam 2, longitudinal beam 3, hoisting hole 4, card and structure 5 and assembly joint 6.

[0039] The crossbeam 2 is an inverted "T" structure, the longitudinal beam 3 is vertically arranged on the upper surface of the crossbeam 2, and the two ends of the longitudinal beam 3 are set on the inverted "T" structure of the crossbeam 2 respectively. A plurality of prefabricated bridge decks 1 are arranged parallel to each other and erected on the upper surface of the longitudinal girder 3, and the prefabricated bridge deck 1 and the longitudinal girder 3 are fixed by the card and structure 5; Composition, the slab rib is set at the end of the lower surface of the prefabricated bridge deck 1, and the card slot is set on the longitudinal beam 3 at the position corresponding to the slab rib. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an assembly type concrete beam plate and an installation and maintenance method. The assembly type concrete beam plate comprises a plurality of prefabricated bridge deck slabsand longitudinal beams; the prefabricated bridge deck slabs are arranged in a parallel mode and erected on the upper surfaces of the longitudinal beams; the prefabricated bridge deck slabs and the longitudinal beams are fixed through clamping structures; each clamping structure is formed by a rib-plate clamped in a clamping groove; each rib-plate is arranged at the end of the lower surface of thecorresponding prefabricated bridge deck slab; and each clamping groove is formed in the position, corresponding to the rib-plate, on each longitudinal beam. The prefabricated bridge deck slabs with the rib-plates are connected with the longitudinal beams with the clamping grooves, and therefore the displacement generated when the prefabricated bridge deck slabs are subjected to the dynamic load effect of vehicles is overcome; construction is convenient; and meanwhile, the service life of the bridge floor is prolonged and maintenance cost is lowered due to the fact that rigidly connected positions are segregated by flexible materials and the buffering effect is played. Hoisting holes formed in the upper surface of the prefabricated bridge deck slabs are used for convenient replacing, so that no large area damage occurs on the bridge floor structure, and time of traffic obstruction is shortened.

Description

technical field [0001] The invention relates to a bridge deck structure, a construction process and a maintenance method, in particular to an assembled concrete beam slab and an installation and maintenance method. Background technique [0002] Bridges with small and medium spans usually adopt girder bridges or arch bridges. When the bridge deck is paved, that is, the roadway pavement, it is the part where the wheels directly act. There are many forms of traffic road pavement, such as cement concrete, asphalt concrete, asphalt surface treatment and mud-bound gravel. Cement concrete and asphalt concrete bridge deck pavement are widely used and can meet various requirements. However, cement concrete pavement has low cost, good wear resistance, and is suitable for heavy-duty traffic, but the curing period is long, and it is troublesome to repair in the future; asphalt concrete pavement is light in weight, easy to maintain and open to traffic, but it is easy to age and deform. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/12E01D21/00E01D22/00E01D101/24
CPCE01D19/125E01D21/00E01D22/00E01D2101/24
Inventor 张建东刘朵余永亮金嘉福周重杨张新春王贤强
Owner JSTI GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products