Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Monitoring method for 230M power load control communication base stations

A communication base station and electric power technology, applied in the direction of power network operating system integration, electrical components, circuit devices, etc., can solve problems that affect the operation of the power load control system, low efficiency, time-consuming and labor-intensive, etc., to shorten the time for fault discovery and judgment, The effect of saving manpower and material resources and improving management efficiency

Active Publication Date: 2018-09-28
JIANGSU ELECTRIC POWER CO +1
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the 230M negative control communication base station fails, the current practice is for the maintenance personnel to go to the 230M negative control communication base station to find and analyze the cause of the failure. On the one hand, the maintenance personnel need experience to find the failure on site; on the other hand, they need to determine the need for maintenance according to the failure situation The part or the parts to be replaced, and then deal with the fault accordingly, which is inefficient, time-consuming and laborious, and seriously affects the operation of the power load control system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Monitoring method for 230M power load control communication base stations
  • Monitoring method for 230M power load control communication base stations

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1)

[0032] See figure 1 and figure 2 , the monitoring method of the 230M power negative control communication base station of the present embodiment is implemented by the monitoring system of the 230M power negative control communication base station. The monitoring system is mainly composed of a monitoring front-end processor, a background server and a monitoring terminal.

[0033] One monitoring front-end processor is installed in each 230M power load control communication base station, and the background server and monitoring terminal are set in the monitoring center of the power load control system. The monitoring front-end processor is used to sample and monitor the working voltage and current of the 230M power negative control communication base station in real time, and send the monitored voltage and current signals to the background server after processing; the background server is used to receive the working voltage and current of each base station. The current real-tim...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a monitoring method for 230M power load control communication base stations. The method is implemented by a monitoring system formed by monitoring front-end processors, a background server and monitoring terminals, wherein one monitoring front-end processor is arranged on each 230M power load control communication base station; the method mainly comprises the following stepsthat each monitoring front-end processor samples working voltage and current and temperature and humidity information of the corresponding 230M power load control communication base station in real time and sends the working voltage and current and the temperature and humidity information to the background server; the background server compares the sampling voltage / current and the temperature information with a built-in empirical value criterion to judge a working state of the base station, and gives an alarm to the monitoring terminals and pushing a judged fault type when the working state is abnormal; and monitoring personnel correspondingly make a fault processing decision according to data and a judgment result which are pushed by the background server. According to the method, the cost is low, the implementation is convenient, the fault discovery and judgment time can be greatly shortened, the manpower and material resources are saved, and the management efficiency of the base stations is improved.

Description

technical field [0001] The invention relates to the technical field of power load management systems, in particular to a monitoring method for a 230M power load control communication base station. Background technique [0002] The 230M load control communication base station is a dedicated channel for the power load control system, and an important platform for orderly power consumption work such as the collection of power consumption information and "no power cuts during peak shifts, no power cuts due to power cuts". When the 230M load control communication base station has problems such as power failure, long hair, abnormal serial server, etc., it will have a very serious impact on power load control and data collection. At present, the 230M negative control communication base station includes a radio station and a DC power supply connected to the radio station. The base station is usually distributed in various substations and other places. It is unattended when it is wor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J13/00
CPCH02J13/0013H02J13/00Y04S20/244Y04S40/126Y02B70/30Y02E60/00
Inventor 李铭方艳薛科科吕惠龙丽卞忠英
Owner JIANGSU ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products