Energy storage bank pool built in underground mine and construction method thereof
A storage group and storage technology, applied in the field of energy storage group and its construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0124] Such as Figure 1 to Figure 5 As shown, the energy storage group built in the underground of the mine in this embodiment includes a plurality of energy storage groups 33, and each energy storage group 33 includes a plurality of energy storages 26, and each energy storage group 33 The tops of two adjacent energy storage banks 26 are connected by upper communication pipes 27, and the lower parts of two adjacent energy storage stores 26 in each energy storage bank group 33 are connected by lower communication pipelines 28, and in each energy storage bank group 33 Three adjacent energy storages 26 are arranged in an equilateral triangle. The energy storages 26 include a storage body, and the storage body of the energy storage 26 located directly below the transportation roadway 32 is provided with an energy transmission pipeline assembly.
[0125] In this embodiment, the top of the storage body of the energy storage 26 located directly below the transportation roadway 32 is...
Embodiment 2
[0216] In this embodiment, one pipeline is used for energy input and output of the energy storage.
[0217] Such as Figure 6 As shown, the energy storage group built in the underground of the mine in this embodiment is different from Embodiment 1 in that: the energy transmission pipeline assembly includes an energy input and output pipeline 30 and a set The energy input and output control valve 31 on the energy input and output pipeline 30 extends into the collection pool 1-4. All the other structures are the same as in Example 1.
[0218] The construction method of the energy storage group built in the underground of the mine in this embodiment is different from Embodiment 1 in that:
[0219] Step 17. When prefabricating the reinforced roof 3 for fixed connection to the energy storage 26 directly below the transportation roadway 32, set the reserved hole 29 for energy input and output pipelines on the reinforced roof 3;
[0220] Step 1722: Pour the anti-seepage material i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com