Construction method for self-elevating drilling platform cantilever beam main beam
A drilling platform and construction method technology, applied in construction, water conservancy projects, artificial islands, etc., can solve the problem that the precision control is not well solved, and achieve the effects of shortening the construction period, reducing risks, and controlling deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] A method for constructing a cantilever beam main beam structure of a jack-up drilling platform, such as figure 1 As shown, the main girder of the cantilever beam is mainly composed of upper flange 1, web 2, lower flange 3, inclined V-plate 4, triangular bracket 5, inner large rib 6, inner small rib 7, outer rib 8 and Outer reinforcing rib 9 forms. After the parts are unloaded, the groove is processed first, and then the plates are spliced, and the T row is prefabricated. The upper and lower T rows are combined to form an I-beam, and the inner and outer ribs are welded to complete the cantilever beam main beam. The main steps are as follows (taking a main beam as an example):
[0046] 1. Splicing of the upper and lower wings of the main beam: the upper wing is divided into 7 parts for CNC blanking, of which parts 11 and 12 are 51mm thick and made of EH36, and the rest of the parts are 76mm thick and made of EQ63. The lower wing plate is divided into 7 parts for CNC bla...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com