Automation control method for tunnel lining construction
An automatic control and tunnel technology, applied in the direction of tunnel lining, tunnel, shaft lining, etc., can solve the problems of difficult to guarantee the quality of lining construction, inaccurate data accounting, low level of automation control, etc. , the effect of reducing tunnel diseases
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The greatest purpose of the present invention is to combine the lining trolley and the vibrating device for unified control, and to realize the automatic control of tunnel lining construction with the assistance of other detectors.
[0028] Combine below figure 1 The technical solution of the present invention is further explained, and the parts not described are subject to the technical solution, and will not be described in detail.
[0029] The lining trolley 1 is a special mechanical device for constructing tunnel lining, and the traveling mechanism 2 and the hydraulic system 3 are used for positioning the lining trolley and forming or demoulding. The concrete distributor 4 is arranged on the upper part of the tunnel lining trolley and can be connected in series with several distribution pipes 8, each distribution pipe 8 is used to quickly distribute the concrete required for pouring the tunnel lining, and a temperature sensor 6 is respectively arranged at the end of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com