Small-diameter micro static-pressure steel pipe pile post-grouting construction method
A technology of static pressure steel pipe piles and construction methods, applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of adverse effects of surrounding pipelines or adjacent buildings, high total construction cost, and affecting the quality of grouting, etc. It achieves the effects of inconspicuous soil squeezing effect, high construction efficiency and low comprehensive cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] A post-grouting construction method for small-diameter miniature static pressure steel pipe piles, specifically comprising the following steps:
[0026] Step 1: Small-diameter steel pipes are cut into sections on site, and the pipe wall is opened. Among them, the steel pipe pile diameter is 70-140mm, the length of each steel pipe is 3-6m, the total length of the pile foundation is 9-15m, and each steel pipe is processed After the completion, it is statically pressed into the soil in sections, and the steel pipes of each section are connected by welding or sleeves, and the pile tip is welded under the steel pipe at the bottom;
[0027] Step 2. After the static pressure steel pipe pile reaches the design position, put the water jet pipe into the steel pipe, and use water pressure to clean up a small amount of soil that enters the steel pipe through the pipe wall hole during the pile pressing process;
[0028] Step 3: After cleaning the inside of the steel pipe, put the fi...
Embodiment 2
[0034] A post-grouting construction method for small-diameter miniature static pressure steel pipe piles, specifically comprising the following steps:
[0035] Step 1: Small-diameter steel pipes are cut into sections on site, and the pipe wall is opened. Among them, the steel pipe pile diameter is 70-140mm, the length of each steel pipe is 3-6m, the total length of the pile foundation is 9-15m, and each steel pipe is processed After the completion, the static pressure is inserted into the soil in sections; between each section of steel pipe, sleeve connection or welding is used when the pile diameter does not exceed 100mm, and welding is used when the pile diameter exceeds 100mm; 1.3-1.5 times of that.
[0036] The opening position of the steel pipe wall vertically from the pile tip does not exceed 2 / 3 of the total length of the pile body. Each section of the steel pipe wall can be symmetrically opened at 1-2 positions, and the shape of the opening is not limited. The size sh...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com