L-shaped rigid joint coupled wall with embedded joint beam section and construction method of L-shaped rigid joint coupled wall

A connected limb wall and pre-embedded technology, applied in the processing of walls, building materials, building components, etc., can solve problems such as unstable structures, unreliable connection relationships, and complex structural stresses

Inactive Publication Date: 2017-02-15
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The object of the present invention is to provide an L-shaped rigid jointed limb wall with pre-embedded jointed beam sections and its construction method, to solve the problems of complex stress, unstable structure, unreliable connection relationship and inconvenient construction of traditional structures. technical problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • L-shaped rigid joint coupled wall with embedded joint beam section and construction method of L-shaped rigid joint coupled wall
  • L-shaped rigid joint coupled wall with embedded joint beam section and construction method of L-shaped rigid joint coupled wall
  • L-shaped rigid joint coupled wall with embedded joint beam section and construction method of L-shaped rigid joint coupled wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0092] Examples see image 3 , Figure 4 As shown, this L-shaped rigid jointed limb wall with pre-embedded joint beam sections includes a first wall unit and a second wall unit that are vertically connected to each other to form an L shape, and the first wall unit and the second wall unit are both prefabricated components, the concrete strength grade is not less than C30 and not higher than C60, the height of the wall is about the floor height minus the thickness of the floor slab, and the two are connected by a joint post-casting tape, the joint Post-pouring belt 3 comprises joint post-casting concrete 30 and the joint post-casting vertical reinforcement 31 and joint post-casting stirrup 32 poured inside the joint post-casting concrete, and the joint post-casting concrete strength level It should be two grades or more higher than the concrete strength grade of the first wall unit and the second wall unit.

[0093] see figure 1 , figure 2 As shown, the first wall unit inc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an L-shaped rigid joint coupled wall with an embedded joint beam section and a construction method of the L-shaped rigid joint coupled wall. The coupled wall comprises a first wall unit and a second wall unit which are vertically connected together to form an L shape; each of the first wall unit and the second wall unit is a prefabricated member; and the first wall unit and the second wall unit are connected through a joint post-cast strip. The L-shaped rigid joint coupled wall is safe and reliable in node connection, favorable in earthquake resistance and also capable of realizing the synchronization of factory prefabrication and on-site installation; wall assembly units are prefabricated in a factory and are spliced and installed on site to ensure that structural members are simultaneously fabricated and installed, so that the construction speed of a main structure is increased, and the guarantee is provided for the on-schedule completion of a construction project; and the on-site wet working quantity of concrete is reduced due to assembly and combination of structures in a construction process, so that the usage amount of formworks and temporary supports is reduced, furthermore, the generated construction wastes are reduced, the requirements for saving materials and protecting the environment are met, and the aim of green construction is achieved.

Description

technical field [0001] The invention relates to the field of building construction, in particular to an assembled wall pier structure and a construction method thereof. Background technique [0002] The high-rise building structure is an inevitable choice to solve the contradiction between the growing urban population and the gradual shortage of urban land in the process of urbanization in my country, and the connected wall structure system is an indispensable element in the high-rise building structure. According to the measured data in the past, the attached wall system not only inherits the advantages of simple shear wall engineering such as low cost and high lateral stiffness, but also reflects the yield energy consumption of the connecting beam under the action of strong earthquakes, avoiding or reducing a large number of cracks concentrated in the The situation at the bottom of the wall has the advantage of reducing the cost of post-earthquake repairs. [0003] Howeve...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/56E04B2/58E04B2/60E04G21/00
CPCE04B2/562E04B2/58E04B2/60E04G21/00
Inventor 李云贵卢海陆刘康张起维王俊波苏靖巍
Owner CHINA STATE CONSTRUCTION ENGINEERING CORPORATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products