Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of complete sand bottom form of molding flasks combination for supporting hanging side of 10,000 tons turning arc bridge abutment

A construction method and technology of sand boxes, which are applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as heavy weight and economic loss, and achieve the effects of no waste of resources, low cost, and time-saving construction

Active Publication Date: 2017-02-01
中铁十八局集团第二工程有限公司 +1
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The upper and lower plates of the abutment of the swivel arch bridge and the central rotating hinge form a rotating system. After the construction is completed, the rotation is realized by the rotation of the upper plate relative to the lower plate. The swivel arch bridge needs to build the upper and lower plates separately. Finally, the steel structure support and steel formwork are used as the supporting bottom formwork, and then the upper wall and other superstructures are built. The weight of the upper wall and the upper junction piers and other auxiliary structures is huge, and the use of conventional formwork as the upper wall bottom form often has a large Hidden dangers, if slurry leakage and mold expansion occur in the upper plate bottom mold during the upper plate pouring process, it will affect the swivel construction operation and cause huge economic losses

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of complete sand bottom form of molding flasks combination for supporting hanging side of 10,000 tons turning arc bridge abutment
  • Construction method of complete sand bottom form of molding flasks combination for supporting hanging side of 10,000 tons turning arc bridge abutment
  • Construction method of complete sand bottom form of molding flasks combination for supporting hanging side of 10,000 tons turning arc bridge abutment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The present invention will be further described below in conjunction with the examples, the purpose is only to better understand the contents of the present invention, therefore, the examples given do not limit the protection scope of the present invention.

[0030] see figure 1 , figure 2 , image 3 , a method for constructing a sandbox-combined all-sand bottom form for supporting the upper plate of the abutment of a 10,000-ton swivel arch bridge, comprising the following steps:

[0031] Step (1): After the construction of the lower wall 2 of the abutment of the swivel arch bridge is completed, the side formwork 8 is set on the boundary of the pouring contour of the upper wall 1 by 50 cm, and the tie bars 9 are set to reinforce the side formwork 8, surrounded by the side formwork 8 The area forms the layout range of the sand box combination full sand bottom form 15. The formwork is made of steel formwork, and the tie bars 9 for formwork fixing are welded by Φ20 stee...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of bridge construction, particularly relates to a construction method of a complete sand bottom form of molding flasks combination for supporting the hanging side of a 10,000 tons turning arc bridge abutment. For one aspect the proper arrangement of ordinary flasks and steel ball flasks with the coordination of spherical hinge constitute a main load bearing system to support the hanging side loads. For another aspect the placement of a layer of mortar bed on compacted river sand, with the coordination of the flask top plates and the concrete in the spherical hinge area constitute the complete sand bottom form of molding flasks combination. The method applies the advantages of strong bearing capacity and minimum deformation of the river sand and mortar bed for the formation of the hanging side to guarantee the safety and precision at the hanging side bottom. At the same time the method also applies the flatness and rigidity merits of the mortar bed to provide a flat working surface for the construction work on the hanging side. The method can make the hanging side grouting construction completely safe and reliable. The method has the advantages of simple process, simple erection and dismantling, low fabrication costs, negligible waste of resources, all of which are beneficial for saving both the work schedule and funds. The method implies huge economical benefits, social benefits and environmental benefits.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a construction method for a sandbox-combined full-sand bottom form for supporting the upper plate of an abutment of a 10,000-ton swivel arch bridge. Background technique [0002] The steps of the construction method of the planar swivel arch bridge are generally as follows: divide the arch ring into two half-spans, use the terrain on both sides to construct the upper and lower walls respectively, set up simple supports and assemble the arch ribs, set the buckle cables and back cables, and tension the buckle cables to make them The arch rib is detached from the support, and the arch rib is rotated through the slow rotation of the upper plate, and the buckle cable is stretched to adjust the arch axis and the elevation of the vault to meet the requirements and then close up. [0003] The upper and lower plates of the abutment of the swivel arch bridge and the central rot...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 王新泽韦有波李自林陈国胜于长彬孙兆会石迎新
Owner 中铁十八局集团第二工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products