Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Coal resource flowing phase exploitation equipment and method based on tunnel boring machine (TBM)

A coal mine and fluid phase technology, applied in the field of coal mine resource mining and utilization, can solve the problems of aggravating surface pollution, mining personnel safety, high casualty rate, and achieve the effect of high facility maintenance cost.

Active Publication Date: 2016-11-09
SICHUAN UNIV
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) Transporting the coal mined underground to the ground requires a large amount of ground space for storage, and building facilities such as concentrators, thermal power plants, and gasification workshops on the ground also requires a large amount of space, and thermal power generation will generate A large amount of coal slag, and when the grade of the coal mine is low, a large amount of tailings will be produced in the mineral processing, these coal slag and tailings are usually piled on the ground, waiting to be processed separately, which will also take up a lot of space, all of which will lead to coal mining and Subsequent conversion and utilization require a large amount of land acquisition, which has the problem of high cost; (2) It takes a lot of energy to transport the coal mines mined from the underground to the ground, and, with the different geological conditions on the ground, the mining points of some coal mines The arrangement of mineral processing plants, thermal power plants, gasification workshops, etc. on the ground is relatively scattered, and it usually needs to rely on rails to transfer materials between various processes, which will also lead to excessive energy consumption; (3) ground mineral processing gangue, waste slag, dust, CO 2 There are many exhaust gases, which will aggravate surface pollution; (4) The construction and maintenance of facilities such as ground mineral processing plants, thermal power plants, and ground transportation tracks all require high costs; Intensive, high labor-intensive, coupled with poor underground conditions, frequent safety accidents, high casualty rate; (6) Due to the need for a large number of manpower to mine, and with the increase of mining depth, the underground working environment will become more and more serious. The worse it is, for example, high temperature and other issues, when the mining depth increases to a certain level, the underground environment is no longer suitable for human survival and work. It is estimated that the current limit depth of the solid phase mining method for coal resources cannot exceed 6,000 meters. Realizing the mining and utilization of coal resources with a depth of more than 6,000 meters is an unattainable luxury for human beings
[0004] Based on the above-mentioned technical status, if we can subvert the existing coal mine resource development technology, develop coal mine resource flow phase development equipment and development methods, and realize the mining and utilization of coal mine resources without people going down the well and coal up the well, it will be of great help to solve the existing coal mine mining methods Existing problems such as high energy consumption, high cost, mining personnel safety, environmental pollution, and inability to realize deep mining will all have positive significance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Coal resource flowing phase exploitation equipment and method based on tunnel boring machine (TBM)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0024] In this embodiment, the structural diagram of the coal mine resource flow phase development equipment based on TBM is as follows figure 1 As shown, the equipment includes a full-face boring machine including a cutter head 18 and a fluid phase development box 20. The cutter head 18 is connected to the fluid phase development box 20 through a connecting piece 19, and also includes a first conveyor belt 1, a fifth conveyor belt Belt 14, gas output pipeline 16, and coal mine separator 3 installed in the flow phase development box, second conveyor belt 4, generator set 6, third conveyor belt 7, fourth conveyor belt 9, filling material processing chamber 11 , gasification device 12 and wireless power transmission equipment 13. The full-section roadheader is a 160 series 155-274 full-section roadheader, produced by Robin Company of the United States, and the coal mine separator 3 is a ZKZ-4 linear vibrating screen machine, produced by Shandong Tai'an Coal Mining Machinery Co.,...

Embodiment 2

[0028] In this embodiment, the TBM-based coal mine resource flow phase development method of the present invention is provided. The method uses the equipment described in Embodiment 1, and the steps are as follows:

[0029] ① Excavate the vertical shaft from the surface to the underground coal mine layer to be mined, hoist the various components of the equipment described in Example 1 to the coal mine layer to be mined along the vertical shaft and install the equipment, connect the gas output pipeline 16 from the shaft to the gas storage room connection, the cement, cement powder and water storage area in the material storage area of ​​the filling material processing chamber 11 are respectively connected from the vertical shaft to the cement, cement powder and water replenishment points on the surface through pipe fittings, and the cement, cement powder and water supply points are regularly supplied to the cement, cement Powder and water storage area replenishes cement, cement ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides coal resource flowing phase exploitation equipment based on a tunnel boring machine (TBM). The coal resource flowing phase exploitation equipment comprises whole section TBM with a cutterhead and a flowing phase exploitation box, a first conveying belt, a fifth conveying belt, a coal gas output pipeline, a coal mine selecting and cleaning device, a second conveying belt, a generator set, a third conveying belt, a fourth conveying belt, a filling material processing chamber, a gasification device and wireless power transmission equipment, wherein the coal mine selecting and cleaning device, the second conveying belt, the generator set, the third conveying belt, the fourth conveying belt, the filling material processing chamber, the gasification device and the wireless power transmission equipment are installed in the flowing phase exploitation box. The invention further provides a coal resource flowing phase exploitation method based on the TBM. According to the provided coal resource flowing phase exploitation equipment and method based on the TBM, the safety of coal resource exploitation can be improved, the labor intensity and the environmental pollution can be relieved, the exploitation energy consumption and cost of coal resources can be reduced, and exploitation of deep coal resources can be achieved.

Description

technical field [0001] The invention belongs to the field of mining and utilization of coal mine resources, and in particular relates to TBM-based coal mine resource flow phase development equipment and a TBM-based coal mine resource flow phase development method. Background technique [0002] With the gradual depletion of coal mine resources in the shallow part of the earth, the development of coal mine resources continues to move toward the deep part of the earth. At present, the mining depth of coal mine resources has reached 1,500 meters. The existing coal mine resources are exploited in the form of solid-phase development, which requires a lot of manpower to mine and transport the mined coal to the surface. The mined coal mines are screened, and the thermal power plants and gasification workshops on the surface are used to generate electricity and produce gas. This development method mainly has the following shortcomings: [0003] (1) Transporting the coal mined underg...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21C41/18E21F15/06C10J3/00B03B5/00
CPCB03B5/00C10J3/00E21C41/18E21F15/06Y02E20/18
Inventor 谢和平高明忠鞠杨高峰张茹邱治强李安强汪文勇
Owner SICHUAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products