A Construction Method for Erecting Steel Tube Rigid Bridge Skeleton by Asymmetric Hoisting

A construction method and asymmetrical technology, applied in erection/assembly of bridges, bridges, bridge construction, etc., can solve problems such as difficult construction and difficulty in erecting water platforms, so as to save the workload of temporary facilities, save construction period and cost, and save costs Effect

Active Publication Date: 2017-10-24
CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the above problems, the present invention provides a construction method for erecting steel pipe rigidity bridge skeleton by asymmetric hoisting, which saves time in the construction period, economically saves the cost of erecting horizontal platforms and passages, and solves the problem of construction difficulty. Solved the difficult problem of setting up the water platform

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Method for Erecting Steel Tube Rigid Bridge Skeleton by Asymmetric Hoisting
  • A Construction Method for Erecting Steel Tube Rigid Bridge Skeleton by Asymmetric Hoisting
  • A Construction Method for Erecting Steel Tube Rigid Bridge Skeleton by Asymmetric Hoisting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] refer to Figure 1 to Figure 4 , which shows the specific structure of the preferred embodiment of the present invention. The structural characteristics of each element of the present invention will be described in detail below, and if there is a description of the direction (up, down, left, right, front and back), it is based on figure 1 The shown structure is a reference description, but the actual use direction of the present invention is not limited thereto.

[0023] The purpose of the present invention is to plan ahead and change the water platform into a land platform when the terrain of the construction site is complex and it is not possible to erect a lifting platform at the mid-span position. According to the terrain conditions, a hoisting platform (the 13th section corresponding to the skeleton) was erected on the side slope of the east bank road and the valley, but the hoisting space was limited. When the east bank was erected to the 13th section, the remain...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for erecting a steel tube stiff bridge framework through asymmetric lifting. The construction method comprises the following steps that a lifting platform is erected on a slope of a valley on the east coast, a load-bearing cable is tensioned, a lifting tackle is arranged on the load-bearing cable, and a pulling cable and a lifting cable are arranged on the lifting tackle; cantilever segments are prefabricated; side spans of the bridge framework of the east coast and the west coast are erected symmetrically, when the side span of the bridge framework of the east coast is erected to the cantilever segment over the lifting platform, erecting of the side span of the bridge framework of the east coast is paused, the side span of the bridge framework of the west coast continues to be erected to the midspan, and the side span of the east coast and the side span of the west coast are about to be combined; and the rest of the cantilever segments of the side span of the bridge framework of the east coast are placed to the corresponding lifting positions, installed through the lifting tackle, and erected sequentially till the side span of the east coast and the side span of the west coast are combined. According to the construction method, by the adoption of the cantilever segment erecting method by combining symmetry with asymmetry, the construction period is shortened, the cost for erecting a horizontal platform and channels is reduced, and the problem that an overwater platform is difficult to erect is solved.

Description

technical field [0001] The invention is used in the technical field of bridge construction, and in particular relates to a construction method for erecting a steel pipe rigid bridge skeleton by adopting asymmetric hoisting. Background technique [0002] China has a long history of arch bridge construction. In ancient times, stone arch bridges were the main bridge type. Today, after the rapid development of industry, arch bridges using different materials and systems have also developed rapidly. In long-span arch bridges, when the steel tube stiff skeleton in reinforced concrete arch bridges is erected by cable crane air transportation, cable-stayed buckle-hanging cantilever assembly method, the hoisting method is generally a symmetrical erection method, which is both small-mileage and long-mileage. The rigid frame is erected segment by segment. After all the cantilever rigid frame segments are installed, the closing section is waiting for installation. The erection sequence...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 李豪闫川川廖云昭邓晓峰周永峰徐亮黄冰陈伟
Owner CHINA RAILWAY GUANGZHOU ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products