Real-time monitoring and grouting reinforcement method for weak surrounding rock tunnel building
A technology of grouting reinforcement and real-time monitoring, applied in tunnels, tunnel linings, earthwork drilling, etc., can solve problems such as inability to accurately evaluate, and achieve the effects of safe and controllable measures, reduction of personnel losses, and reasonable measures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, so as to facilitate the understanding of engineers and technicians.
[0031] like figure 1 , figure 2 , image 3 As shown, the present invention provides a kind of real-time monitoring grouting reinforcement method that weak surrounding rock tunnel is built, and this method comprises the following steps:
[0032] Step 1. When the tunnel completes the excavation task of about 50cm in one cycle, stop the task and prepare the wet spraying machine.
[0033] Step 2. Use net spray to seal the face of the face, drill holes along the face with a pick or a rock drilling jumbo, and drive in small conduits in advance. The small conduits are driven in along the arch and core soil of the face, and The distance between the small catheters is 0.3-0.5m, and the advanced small catheters penetrate into the face of the operation about 1.5m-3m.
[0034] Step 3....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com