Seismic isolation reinforcement method for existing pile foundation buildings
A technology for foundation buildings and buildings, which is applied to the field of seismic isolation reinforcement of existing pile foundation buildings, can solve the problems of lack of seismic performance, potential safety hazards in the epicenter, and increased probability of column collapse at the upper and lower parts of the seismic isolation bearing, and achieves improved coordination. Ability to work, increase safety, increase damping effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment 1: A seismic isolation reinforcement method for an existing pile foundation building, comprising the following steps: (1) Excavating the soil body: determining the position of the original supporting platform 3 of the building superstructure (see figure 1 ), and excavate the soil where one of the original supporting caps was located, and expose the original supporting cap and the pile foundation 4 below the original supporting cap; Excavation at the same time, if it is the original supporting cap inside the building, it will be excavated directly from the indoor ground; the excavation range is 1m around the original supporting cap, and the excavation depth is 0.8m below the bottom of the original supporting cap;
[0033] (2) Build a new support cap: on the top surface of the excavated soil, connect horizontal steel bars and stirrups and pour concrete to form a new support cap 9, which is directly below the original support cap; The minimum area of the new s...
Embodiment 2
[0040] Embodiment 2: A seismic isolation reinforcement method for an existing pile foundation building. The difference from Embodiment 1 is that after the new support cap 9 is constructed, the original support cap is supported by the original pile foundation as a supporting device, and Install the seismic isolation bearing 8 directly between the new supporting platform and the original supporting platform. The seismic isolation bearing is located in the space surrounded by the pile foundation. After the seismic isolation bearing is installed, disconnect the original supporting platform and the new supporting platform. For the pile foundation between the abutments, the disconnected position is at the position where the pile foundation is connected to the original supporting platform, and a gap is formed at this position. And refer to embodiment 1 with steps.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com