Deformation reinforcing method of karst cave tunnel initial support
A technology for tunnels and karst caves, which is used in tunnels, tunnel linings, and earth-moving drilling and mining.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Such as figure 1 and image 3 The primary support of the tunnel shown includes a plurality of arched steel beams 2 arranged at intervals on the tunnel. The arched steel beams 2 of this embodiment are made of I-shaped steel. The above-mentioned method for strengthening the deformation of the primary support of the karst cave tunnel includes the following steps :
[0027] A. A plurality of anchor pipes 1 protruding into the weak surrounding rock are arranged at intervals on the side walls of the tunnel on both sides of the primary branch deformation section of the karst cave tunnel. Anchor pipe 1 spacing is 1.8 meters;
[0028] The installation method of anchor pipe 1 is as follows:
[0029] a, drill a plurality of inclined downward anchor pipe installation holes in the side wall of the tunnel, the diameter of the anchor pipe installation hole of the present embodiment is 108 millimeters; The inclination angle a between the center line and the horizontal direction is ...
Embodiment 2
[0036] Such as figure 1 and image 3 The primary support of the tunnel shown includes a plurality of arched steel beams 2 arranged at intervals on the tunnel. The arched steel beams 2 of this embodiment are made of I-shaped steel. The above-mentioned method for strengthening the deformation of the primary support of the karst cave tunnel includes the following steps :
[0037] A. A plurality of anchor pipes 1 protruding into the weak surrounding rock are arranged at intervals on the side walls of the tunnel on both sides of the primary branch deformation section of the karst cave tunnel. Anchor pipe 1 spacing is 2.2 meters;
[0038] The installation method of anchor pipe 1 is as follows:
[0039] a, drill a plurality of inclined downward anchor pipe installation holes in the side wall of the tunnel, the diameter of the anchor pipe installation hole of the present embodiment is 108 millimeters; The inclination angle a between the center line and the horizontal direction is ...
Embodiment 3
[0046] Such as figure 2 and image 3 The primary support of the tunnel shown includes a plurality of arched steel beams 2 arranged at intervals on the tunnel. The arched steel beams 2 of this embodiment are made of I-shaped steel. The above-mentioned method for strengthening the deformation of the primary support of the karst cave tunnel includes the following steps :
[0047] A. A plurality of anchor pipes 1 protruding into the weak surrounding rock are arranged at intervals on the side walls of the tunnel on both sides of the primary branch deformation section of the karst cave tunnel. Anchor pipe 1 spacing is 2 meters;
[0048] The installation method of anchor pipe 1 is as follows:
[0049]a, drill a plurality of inclined downward anchor pipe installation holes in the side wall of the tunnel, the diameter of the anchor pipe installation hole of the present embodiment is 108 millimeters; The inclination angle a between the center line and the horizontal direction is 15...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com