Protection method for slope with mixture of soil and rock
A technology for slopes and rocks, applied in the field of environmental protection engineering, can solve the problems of ineffective maintenance of slopes mixed with soil and rocks, easy to cause debris flow, etc., and achieve the effects of low cost, protection of the natural environment, and simple operation steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0021] First remove the impurities on the slope surface and level the uneven slope surface, then spray the slope surface with water until the soil moisture content on the surface of the slope surface reaches 45%; pressurize 4 holes per square meter, and choose a hole diameter of 4cm , a variable-hole aeration hose with a length of 3m, a drill bit matching the hole diameter of the variable-hole aeration hose is installed at one end, and the other end is connected with a pressure charging device, and the drill bit is inserted into the slope land at an inclination angle of 45° On the surface, start the pressure charging device and control the pressure to 8MPa. After all the variable-porous aeration hoses enter the slope, stop the pressurization and take out the variable-porosity aeration hose; then select the aperture to be 2cm and the length to be 3m. The variable hole aeration hose is drilled according to the above-mentioned installation method and pressurized drilling method, a...
example 2
[0023]First remove the impurities on the slope surface and level the uneven slope surface, then spray the slope surface with water until the soil moisture content on the surface of the slope surface reaches 40%; pressurize 4 holes per square meter, and choose a hole diameter of 3cm , a variable-hole aeration hose with a length of 2m, a drill bit that matches the aperture of the variable-hole aeration hose is installed at one end, and the other end is connected with a pressure charging device, and the drill bit is inserted into the slope land at an inclination angle of 30° On the surface, start the pressure charging device, control the pressure to 7MPa, wait for the variable hole aeration hose to enter the inside of the slope, stop the pressure, and take out the variable hole aeration hose; then choose the hole diameter to be 1cm and the length to be 2m The variable hole aeration hose is drilled according to the above-mentioned installation method and pressurized drilling method...
example 3
[0025] First remove the impurities on the slope surface and level the uneven slope surface, then spray the slope surface with water until the soil moisture content on the surface of the slope surface reaches 40%; pressurize 4 holes per square meter, and choose a hole diameter of 3cm , a variable-hole aeration hose with a length of 2m, a drill bit matching the aperture of the variable-hole aeration hose is installed at one end, and the other end is connected with a pressure charging device, and the drill bit is inserted into the slope land at an inclination angle of 40° On the surface, start the pressure charging device, control the pressure to 7MPa, wait for the variable hole aeration hose to enter the inside of the slope, stop the pressure, and take out the variable hole aeration hose; then choose the hole diameter to be 1cm and the length to be 2m The variable hole aeration hose is drilled according to the above-mentioned installation method and pressurized drilling method, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com