A construction method for ultra-short steps in tunnels crossing operating highways

A technology of expressways and ultra-short steps, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of slow construction progress of stratum tunnels, difficulties in forming holes in stratum tunnels, and difficult tunnel construction, achieving fast construction progress, The effect of fast overall structure speed and low allocation of mechanical and labor resources

Active Publication Date: 2017-08-08
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 2ND ENG CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

There are a large number of quicksand strata in the complex terrain of our country. The quicksand stratum is different from the characteristics of general soft rock and soil. It has rheological properties, which makes it difficult to form tunnels in this stratum, with poor stability and difficult support.
[0003] At present, the tunnel construction in the existing expressway section is difficult and the construction technology is complicated. The construction progress of the tunnel in this stratum is slow, the stability is poor, and the construction safety is low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for ultra-short steps in tunnels crossing operating highways
  • A construction method for ultra-short steps in tunnels crossing operating highways
  • A construction method for ultra-short steps in tunnels crossing operating highways

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The above and other technical features and advantages of the present invention will be described in more detail below in conjunction with the accompanying drawings.

[0040] see figure 1 As shown, it is a schematic flow chart of the ultra-short step construction method for crossing the operating expressway tunnel of the present invention. The construction is to first set up a stable guiding support structure, and then the three-step method is used for construction. The specific process is:

[0041] Step a, long pipe shed construction;

[0042] Step a1, guide wall construction; before the construction of the guide wall, excavate and brush the slope of the side slope, the slope of the side slope is 1:1, and the slope of the slope below the excavation line of the cave roof is adjusted to 1:0.2.

[0043] The guide wall is 1m thick and 1.2m long. The guide wall is equipped with three I20b I-shaped steel frames, and the outer side of the I-shaped steel is welded with guide...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method of ultrashort steps crossing operational expressway tunnel. The construction method comprises the following steps: a long pipe shed is constructed; a guide wall and the pipe shed are respectively constructed; a slope is dig and brushed before the guide wall is constructed; the slope brushing gradient is 1: 1; the slope brushing gradient is adjusted to 1: 0.2 below a tunnel top digging line; two layers of supports are adopted; the tunnel adopt two layers of primary supports; an expressway is modified; a three-step temporary inverting method is used for constructing; an upper step, a middle step, a lower step and a bottom tunnel are dig in sequence; an inverting construction method is used for gradually constructing; the support structure is stressed by an automatic monitoring system; a monitoring device is arranged on the section of the tunnel for acquiring and processing information of tunnel displacement deformation and soil pressure change of the tunnel and monitoring the tunnel construction conditions in real time; and a secondary lining is followed up. Compared with a traditional construction method, the construction method has the advantages of high construction safety, quick construction progress, short construction period and low allocation of part machines and labor resources.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to an ultra-short step construction method for a tunnel crossing an operating expressway. Background technique [0002] In today's society, the development of the transportation system directly restricts the development of the country's comprehensive strength. There are a large number of quicksand formations in the complex terrain of our country. The quicksand formation is different from the characteristics of ordinary soft rock and soil. It has rheological properties, which makes it difficult to form tunnels in this formation, with poor stability and difficult support. [0003] At present, the tunnel construction in the existing operating expressway section is difficult and the construction technology is complicated. The construction progress of the tunnel in this stratum is slow, the stability is poor, and the construction safety is low. [0004] In view of the above-mentioned ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D11/00E21F17/18
CPCE21D9/00E21D11/003E21F17/18
Inventor 苗增润马殷军徐润泽宋战平王忠双潘大鹏陈国彬徐宏鹏牛泽林
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 2ND ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products