Method for heaping up waterproof tailing pond dam body at one time using tailing coarse sand together with geomembrane
A geomembrane, one-off technology, applied in the field of tailings dam construction, can solve the problems of unsecured dam body stability, cannot be completed at one time, low work efficiency, etc., to facilitate future reuse, save investment, and increase storage capacity. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0008] Example 1: 1), the beneficiation tailings are classified by a cyclone, and the sand is then classified by a high-frequency linear vibrating screen to obtain coarse sand with a water content of about 15%; ensure that the particle size is more than 0.2mm. More than %, material uniform deviation coefficient K 偏 =40%; (2) Roll the obtained coarse sand on the treated dam foundation to build the dam, ensuring that the inner and outer slope ratio is 1:2, and the dry bulk density is 1.6t / m 3 , permeability coefficient 1.3×10 -4 cm / s; (3) A layer of impermeable geomembrane is covered on the slope of the piled dam body; (4) The slope of the piled dam body is protected with plain concrete prefabricated blocks.
Embodiment 2
[0009] Example 2: (1), the mineral processing tailings are classified by a cyclone, and the sand settling is then classified by a high-frequency linear vibrating screen to obtain coarse sand with a water content of about 18%; ensure that the particle size is more than 0.2mm. More than 50%, material uniform deviation coefficient K 偏 =60%; (2) Roll the obtained coarse sand on the treated dam foundation to build the dam, ensuring that the inner and outer slope ratio is 1:3, and the dry bulk density is 1.8t / m 3 , permeability coefficient 1.5×10 -4 cm / s; (3) A layer of impermeable geomembrane is covered on the slope of the piled dam body; (4) The slope of the piled dam body is protected with plain concrete prefabricated blocks.
[0010] Coarse sand is a relative concept. Due to the different physical characteristics of various tailings, the particle size is also different. The judgment standard is to combine the external slope ratio of the dam body to ensure the stability, safety ...
PUM
Property | Measurement | Unit |
---|---|---|
Dry unit weight | aaaaa | aaaaa |
Permeability coefficient | aaaaa | aaaaa |
Dry unit weight | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com