Connecting and grouting sleeve for assembled prefabricated member steel bars and construction method thereof
A technology of prefabricated components and grouting sleeves is applied in the directions of building components, structural elements, building reinforcements, etc., which can solve the problems of difficult to guarantee the quality of steel bar connection, complicated construction process, and inability to connect steel bars, and achieve simple construction, low cost, The effect of reliable connection effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0010] The sleeve body 1 of the present invention can be made by casting. In order to remove the mold smoothly, the wall thickness of the middle part of the sleeve body 1 can be greater than that of the two ends, which is more in line with the distribution rule that the internal force in the middle part of the sleeve body is large and the internal force at both ends is small. The independent cubic block-shaped protrusion 6 provided on the inner wall of the sleeve ensures the bonding effect between the steel bars 7 and 8, the grouting material and the sleeve body 1. After the grouting material is solidified and hardened, the two reserved steel bars are connected through the sleeve to form a One. The outer diameter of the elastic rubber sealing ring 2 at both ends of the sleeve body 1 is greater than the inner diameter of the sleeve body 1, and the inner diameter of the elastic rubber sealing ring 2 is slightly smaller than the outer diameter of the steel bars 7 and 8 to ensure t...
Embodiment 2
[0012] The construction method of the present invention is as follows. After the assembled prefabricated components are manufactured in the factory, the reserved steel bar 7 can be temporarily fully inserted into the sleeve body 1, and temporarily fixed with the limit bolt 3 to prevent the sleeve from being lost. During assembly construction, the limit bolt 3 is loosened. Remove the sleeve body 1, put two elastic sealing rubber rings 2 on the reserved steel bars 7 and 8 respectively, screw in the limit bolt 3 to limit the position of the steel bar 7 and the steel bar 8 in the sleeve, and put the The reserved steel bars 7 and 8 of the two assembled prefabricated components are inserted from both ends of the sleeve body 1 to a limited position, squeezed into the elastic sealing rubber ring 2, the grouting gun is connected to the grouting hole 4 through threads, and the cement-based grouting material is poured in , When grouting, the vent hole 5 should be unblocked to ensure that...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com