A method for testing formation pressure bearing capacity before cementing
A pressure-bearing capacity and cementing technology, which is applied in the direction of earthwork drilling and production, wellbore/well components, etc., can solve the problems of increased drilling fluid density, undiscovered formation pressure-bearing capacity inspection, and inaccurate judgment of formation pressure-bearing capacity, etc. To achieve the effect of overcoming blindness, determining scientific rationality, and improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0037] As the best implementation mode of the present invention, its steps include:
[0038] A method for testing formation pressure bearing capacity before cementing, characterized in that the steps are:
[0039] Step 1: After drilling, run the drill pipe directly to the casing shoe, design the wellhead pressurization value according to the maximum dynamic equivalent density of the annular space during cementing, gradually pressurize the wellhead, and observe the pumping volume and pressure changes. When the pressure inflection point or the wellhead pressure reaches the design value, stop the inspection immediately, record the final pressure data, and then calculate the formation pressure capacity at the casing shoe. If the formation pressure capacity does not meet the requirements, plugging operations are required. If the formation pressure capacity proceed if required
[0040] Step 2: Design the heavy drilling fluid density according to the maximum annular dynamic equivale...
Embodiment 2
[0093] Embodiment 2—specific application example
[0094] The formation pressure test method described in the present invention has been tested and verified in many wells such as Piedmont 1 Well and Piedmont 22 Well of the Xiangguosi gas storage, and achieved good test results. This test method is used to ensure that the dynamic equivalent density of the annular space does not exceed the pressure bearing capacity of the formation during cementing, realizes balanced pressure cementing, and greatly reduces the risk of lost circulation.
Embodiment 2-1
[0096] The formation pressure test method described in the present invention has been successfully applied in Well Piedmont 1 with φ339.7mm conventional casing cementing. 1.45g / cm was used in the third opening of Shanqian 1 Well 3 The drilling fluid φ444.5mm drill bit was drilled to 1539m. During the drilling process, many leakages occurred and several plugging operations were performed. Accurately judging the pressure bearing capacity of the formation after plugging is the key to achieving balanced pressure cementing and preventing The key to well leakage in construction. According to the calculation results of the cementing engineering design software, the casing shoe shall be 1.80g / cm 3 The equivalent density of the drilling fluid was 1.76g / cm2 in all wells in the second step. 3 Drilling fluid (by gradually increasing the density of the drilling fluid, each time 0.05g / cm 3, cycled for 1 week to observe the leakage situation), simulated the cementing design injection disp...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com