Method for determining pipeline critical burial depth in debris flow areas
A determination method, debris flow technology, applied in the direction of pipeline laying and maintenance, pipes/pipe joints/fittings, mechanical equipment, etc., can solve the problems of lack of science and objectivity, and weak ability to resist risks and disasters
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] A method for determining the critical buried depth of pipelines in debris flow areas, including the following steps:
[0065] Step 1. Determine the basic type of debris flow:
[0066] According to the local hydrometeorological data and the survey guide for the debris flow area, the type of a large-scale debris flow in a certain debris flow ditch can be obtained:
[0067] (1) If the clay content in the soil V 3 (The mud flow is 1200-1500kg / m 3 ); There is turbulent movement without obvious turbulence; the accumulation is obviously sorted, and the soil particles are larger than the original soil where the debris flow occurred; it is determined to be a thin debris flow;
[0068] (2) If the clay content in the soil> 3%, mud and rock fluid viscosity> 0.3Pa·s, the volume concentration of soil in the debris flow C V > 50%, the bulk density of mud and rock fluid> 1800kg / m 3 (Mud flow> 1500kg / m 3 ); Shows overall laminar flow with turbulence; there are undisturbed soil blocks in the flui...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com