Mounting, burying and grouting method for multi-point displacement meter
A technology of displacement meter and grouting, which is applied in the field of foundation soil survey, construction, infrastructure engineering, etc. It can solve the problem of insufficient grouting and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] During the specific construction, use a PVC pipe with suitable hardness, cut off the appropriate length, bind it with the displacement meter according to the corresponding position, and send it into the installation hole synchronously. Mark the three pipes outside the orifice respectively, fill the gaps in the orifice with geotextile and cement slurry, and then seal the orifice with cement mortar. Grouting can be done after the hole sand has solidified. For rock formations such as gneiss with large cracks and large groundwater, the first grouting pipe can be used to perform primary grouting with a large water-cement ratio (up to 1:5, ash refers to cement). pulp plug.
[0013] Try to use the first grouting pipe when grouting. When grouting to the second grouting pipe, you can block the second grouting pipe first, and then continue to use the first grouting pipe to grout to the exhaust pipe For grouting, the water-cement ratio is 1:5 when grouting the first grouting pip...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com