Quick system rebuilding method of large area power grid blackout
A system reconstruction and power grid technology, applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the problems of complex factors in the safe and stable operation of the power system, system chain reactions, system power outages, etc., to improve the ability to quickly respond to major accidents effect of ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Embodiment 1, using the "black start mode of the water turbine set" recovery:
[0026] 1) The dispatcher urgently opened the 110kV double-circuit line of the Xingxi line; after the main network was completely shut down, the power was sent to the Qianxi substation through the 110kV lines of Xihei and Xingxi, and the 220kV bus was sent back through the main transformer of Qianxi. Start the Fengrun thermal power unit through Qianxi-Jiangjiaying-Changzhuang-Zhezhoushan;
[0027] 2) The dispatcher urgently opened the 110kV double-circuit line of the Xingxi line; after the main network was completely stopped, the power was sent to the Qianxi substation through the 110kV lines of Xihei and Xingxi, and the 220kV bus was sent back through the main transformer of Qianxi. Pass through Qianxi-Yangle-Dengxinfang power plant units.
Embodiment 2
[0028] Embodiment 2, using the "black start mode of the gas unit" to recover:
[0029] Use Qian'an Gas Unit
[0030] 1) The local dispatch ordered Qian'an Gas Unit 1 to start up;
[0031] 2) Charge to the Kouzhuang substation through the 110 kV fuel buckle line;
[0032] 3) Send power to the 220 kV busbar of Yangle Substation through the main transformer of Kouzhuang substation and the 220 kV Lekou line;
[0033] 4) Charge to Yinanfu Station through the 220 kV Leyi Line;
[0034] 5) Charge to Haozhuang Station through the 220 kV Yihao Line;
[0035] 6) Charge to Jiangjiaying Station through 220kV Jianghao Line;
[0036] 7) Charge to Changzhuang Station through 220 kV Jiangchang Line;
[0037] 8) Charge to the axle mountain station through the 220 kV regular train line;
[0038] 9) Send to Tangfeng Thermal Power 220 kV busbar through 220 kV Feng Che Line 1;
[0039] 10) Start two 300,000-kilowatt units through Tangfeng Thermal Power's 220 kV high-voltage start-up and bac...
Embodiment 3
[0041] Embodiment 3, using "island black boot mode" recovery:
[0042] "Parallel" recovery means using Tangshan's 110kV local power plant to form an isolated grid as a black-start power supply for the grid;
[0043] When the main network collapses, the low-key watchman quickly disconnects a certain power plant and the main station network line, so that the power plant and its load are balanced, and the isolated network operation is maintained; then the generator of the large power plant is used as a starting power supply through the connection line. Gradually restore power to the grid;
[0044] Xijiao Thermal Power Plant
[0045] 1) The dispatcher urgently opened the Hanxi double-circuit line, and the Xijiao Power Plant carried the 110 kV load of the Southwest Suburb and Beigang Stations, and the Xijiao Power Plant operated in an isolated network. After the main grid is completely shut down, power will be sent to the Chezhengshan substation through the 110kV line in the Sout...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com