Dam with pile groups and permeable frame and construction method of dam
A technology of permeable frame and construction method, applied in dams, embankments, coastline protection and other directions, can solve the problems of relatively limited flood control standards, large engineering volume, large water volume, etc. simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not limit the present invention.
[0022] Such as figure 1 A kind of pile group permeable frame dam shown, it comprises vertical dam pile 1, grid 2, permeable frame 3, and vertical dam pile 1 drives in advance and is set in the construction river, and vertical dam pile 1 is set There are transverse beams (not shown in the figure) used to ensure the stability between vertical dam piles 1, and grid 2 is provided between adjacent vertical dam piles (the structural diagram of grid 2 is shown in figure 2 shown), the vertical dam pile 1 and the grid 2 constitute a closed section, the permeable frame 3 is placed in the grid 2, the outer wall of the vertical dam pile 1 is provided with a limit device 4 composed of a permeable frame, and the limit device 4 Set in the down...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com