Method for synchronously controlling sinking double-wall steel cofferdam by jack
A double-wall steel cofferdam and synchronous control technology, which is applied in construction, infrastructure engineering, etc., can solve problems such as poor synchronization, easy cracks, and safety accidents
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] Below in conjunction with accompanying drawing, the present invention will be further described.
[0015] figure 1 Shown is a structural schematic diagram of the present invention, combined with figure 1 Schematic diagram of the section along the line A-A Figure 1 It seems that the concrete steps that the present invention implements are:
[0016] (1) To build the portal frame, on both sides of the double-walled steel cofferdam 4, use the steel platform 1, the steel pipe pile 5, the inner steel pipe 12 and the outer steel pipe 7, and the double I4Oa I-beam 2 to make 10 intervals The cofferdam of cloth is used to lift the sinking gantry frame, wherein, the inner steel pipe 12 and the outer steel pipe 7 are respectively arranged on the steel platform 1 and the steel pipe pile 5 on both sides of the cofferdam 4, and the I-shaped steel beam 2 is horizontally mounted on the inner steel pipe 12 and the top of the outer steel pipe 7 constitute a door frame. Place a 100t s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com