Construction method of passage of large-section tunnel by water diversion fault
A construction method and technology of water-conducting faults are applied in the field of roadway construction to achieve the effects of strong systematicness, clear thinking and high promotion value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0024] Those skilled in the art can implement the method according to the content of the invention, and will not be described in detail here. The advantages of the present invention are further illustrated below through an embodiment.
[0025] For example, a mine needs to pass through the Lijia fault when designing the track Shimen roadway in the sixth mining area. In view of the actual situation, the technicians first used the three-dimensional seismic exploration technology to find out the development of the geological structure in detail on the Lijia fault, and then used the ground transient electromagnetic detection technology to find out the distribution of the water-rich area near the fault and determine the specific location of the Lijia fault. On this basis, the excavation level and layout of the roadway were determined, the protective coal pillar was calculated to be 116m, and the distance from the Lijia fault was set to be 176m as the water detection warning line. M...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com