Pillarless phased caving method with top tailing crushed stone filling and sectional water injection binding
A technology of staged caving and no bottom pillar, applied in fillings, safety devices, ground mining, etc., it can solve the problems of easy adhesion, overburden bonding, affecting fluidity, etc., and achieves good popularity and economical efficiency. obvious effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The specific embodiments of the present invention will be further described below in conjunction with the drawings.
[0038] Such as Figure 1~11 As shown, the bottom-pillar-free stage caving method with top tailings gravel filling and segmented water injection bonding of the present invention includes dividing the ore body into stages, in which the stoping approach 1 is arranged in a rhombic staggered manner, and the stages are divided For segmentation, rock drilling, blasting and mining are all completed in the mining roadway 1. figure 1 Middle 2-1 is the overburden rock, and 3 is the ore body caving range line of each access road. Pre-concentrated rock drilling is used in the mining roadway 1 to arrange the upward fan-shaped medium and deep holes 5, and retreat under the overburden 2-1 When the end wall is at the same vertical position or a position where the lower section is ahead of the upper section by one eaves distance, the stoping takes the stage as the unit, and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com