Measure apparatus of flue gas desulphurization absorbing tower, slurry pH meter and densitometer by using wet method and its method
A technology for wet flue gas desulfurization and measuring device, which is applied in the direction of measuring device, specific gravity measurement, separation method, etc., can solve the problems of reducing service life and energy waste, and achieves the effects of reducing equipment wear, energy consumption and pressure.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] A wet flue gas desulfurization slurry pH meter and density meter measuring device, comprising a desulphurization island absorption tower 1, a pH meter container 2, a pH meter 3, a density meter 4 and a slurry main pipeline 5 in the desulphurization island absorption tower. The technical points are :The pH meter container 2 is also equipped with a filter screen 6, the electrode of the pH meter 3 is built in the pH meter container 2, the lower end of the pH meter container 2 is connected with a flushing drain valve 8, and the pH meter container 2 and the desulfurization island absorption tower 1 are provided A bypass gate 9 is provided between the inlet door 7, the upper end opening of the pH meter container 2 and the density meter 4, and the other opening of the upper end of the density meter 4 is connected to the drain pipe 12, and the lower end of the drain pipe 12 is provided with a lever device 13, A trench 16 is provided under the lever device 13, an absorption tower ...
Embodiment 2
[0021] The invention also provides a pH meter and a density meter measuring method for wet flue gas desulfurization slurry. The wet flue gas desulfurization absorption tower slurry is directly drawn from the absorption tower wall, and the liquid level pressure of the absorption tower slurry is used to provide power and flow. The bypass gate 9 adjusts the flow rate at 3-5m / s to meet the requirements of the density meter 4 to measure the flow rate. The pH meter 3 measures the upper part of the buffer tank and the pH meter 3 and the density meter 4 are installed at 0 meters on the side of the trench 16 for desulfurization. The slurry of the absorption tower flows out of the main slurry pipe 5 installed in the absorption tower of the desulphurization island, flows in through the lower part of the measuring buffer tank with the pH meter 3, flows out from the upper part, and then flows in from the lower part of the density meter 4, flows out from the upper part, and leads to the trench...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com