System and method for preparing gravel mixed with dam core wall
A technology for preparing system and gravel is applied in the field of dam core wall mixing gravel material preparation system, which can solve the problems of high operation cost and complicated process, and achieve the effect of reducing crushing and screening processes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Such as figure 1 In, a dam core wall mixed with gravel material preparation system, a bar feeder 1 is provided under the receiving bin 9, and the upper screen of the bar feeder 1 is connected to the jaw crusher 2, and the bar feeder The under-screen of the feeder 1 and the discharge port of the jaw crusher 2 are connected to the gravel semi-finished product yard 5 through a belt conveyor;
[0025] The gravel material semi-finished product storage yard 5 is connected to the screening machine 3 through a belt conveyor, the bottom of the screening machine 3 is connected to the gravel material storage yard 4 through a belt conveyor, and the screen top of the screening machine 3 is connected to the cone crusher 6 for cone crushing The exit of the machine 6 is connected to the gravel product storage yard 4 through a belt conveyor.
[0026] The bar spacing of the bar feeder 1 is 150mm±15mm.
[0027] The discharge opening of the jaw crusher 2 is 170 mm±17 mm.
[0028] The mesh size of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com