Construction method for managing underground mined-out area or cavity
A construction method and goaf technology, which are applied in mining equipment, earthwork drilling, filling and other directions, can solve the problems of low filling saturation, complexity and high cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] The general situation of this embodiment is: a power plant is proposed to be built, and it is found during the geological survey that the ground is a goaf formed by manual coal excavation. Weakly weathered rock formation, 10-20m. The height of the cavity formed by coal mining is 3-6m, and the area of the goaf is 1500m×300m=450,000m 2 , the volume of the mined-out cavity is about 1.57 million cubic meters, and the water height in the cave is 1.0-1.5m. If the grouting scheme is adopted, the estimated cost is 390 million yuan, and the construction period is one year. Now the construction method of the present invention is adopted, and the final account cost is 80 million yuan , and the construction period is three months.
[0021] The concrete implementation method of embodiment one is:
[0022] First, drill holes from the ground until the top surface of the hole is drilled, and the diameter of the hole is 150mm;
[0023] Second, a steel pipe with a length of 7m and a...
Embodiment 2
[0026] The overview of this embodiment is: there are 8 residential buildings in a residential area, with 30 floors above the ground and one floor underground, and the floor area of each building is 840m2 2 , each building is designed with 178 perforated piles with a diameter of Φ700 and a pile length of 12m. The geological situation is as follows: ①silty clay layer with an average thickness of 8m at the bottom of the foundation pit; ②strongly weathered rock layer with an average thickness of 2m; ③Medium weathered and weakly weathered rock formation with an average thickness of 10m. ④The lower part is a cavity with a height of 2-7m. The underground cavity area is about 80,000 square meters, and the cavity volume is about 480,000 cubic meters. If the overall cavity grouting scheme is adopted, Its cost is about 120 million yuan, which is not feasible for this project. After adopting the construction method of the present invention, its design scheme is to arrange a concrete cir...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com