Quick strengthening method of extremely soft sludge
A silt and fast technology, applied in the field of rapid reinforcement of extremely soft silt, can solve problems such as long construction period, and achieve the effect of reducing the reinforcement period, reducing pollution, and shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] Please refer to the following Figure 3A ~ Figure 3D , is an implementation process of an application example of the present invention.
[0050] Please refer to Figure 3A , which is the original state of the field without any action. There is no need to deal with the muddy soil layer on the soil layer, and the upper layer is fluid mud or floating mud that is dredged, that is, the extremely soft mud that the present invention will solve.
[0051] Please refer to Figure 3B , lay the bamboo mesh frame shown in Figure 3 in the extremely soft silt, and then lay the geotextile on the upper surface of the bamboo mesh frame, and further lay the water-collecting sand cushion on the geotextile, from the water-collecting sand cushion to the Vertical drainage bodies are inserted below, and these vertical drainage bodies extend to the position close to the soil layer that does not need to be treated; and the pumping pipes are buried from the outside to the water-collecting sand...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com