Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for piers

A construction method and bridge pier technology, which is applied to bridges, bridge parts, bridge construction, etc., can solve the problems of long construction work surface, large construction work surface, and narrow construction site of bridge pier foundation, so as to overcome the shortage of construction site and shorten the construction time. Time and the effect of improving construction efficiency

Active Publication Date: 2010-06-09
THE SECOND OF CHINA RAILWAY PORT CHANNEL ENG GROUP +1
View PDF0 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, there are many construction methods for bridge pier construction, but conventional construction methods are generally only applicable to the situation where the construction work area is wide and the construction period is long
For the situation where the construction work area is narrow and the construction period is tight, the current conventional construction methods cannot meet the requirements: ①. Scattered construction requires a larger construction work area and a longer construction period; ②. Water construction requires a larger construction work surface; ③, flowing water construction is less efficient and requires a longer construction period
[0003] In addition, in some cases of poor construction environment: large fluctuations in flood and dry water levels, bridge piers close to wharfs, long-fuel refueling ships that have not been relocated nearby, embankments and river beaches on the shore side, and the distance to the slope top of the beach is too close Under such circumstances, the construction site of the bridge pier foundation is narrow, and the existing bridge pier construction method is difficult to carry out smooth construction under such circumstances.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for piers
  • Construction method for piers
  • Construction method for piers

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The present invention will be further described below in conjunction with drawings and embodiments.

[0036] To build bridges in river basins, of course, it is necessary to fully grasp the hydrogeological data over the years, and to fully consider the annual differences, collect the changes in water level elevation after half a month or even a month, accurately arrange the construction time of each process related to the water level, and carefully organize Human and material resources are racing against water levels.

[0037] After the preparatory work is done, the construction of the bridge pier can begin, including the following steps:

[0038](1) Conduct geological exploration: the elevation of the riverbed within the foundation range is +10.5m~+14.3m. The overburden above the elevation of -21.5m is mainly artificial filling soil and recent sediments of the Holocene river facies. The berm was thrown and filled in the past. The first layer is 1-4m thick and the elev...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction method for piers, which comprises the following steps: (1) performing geological exploration, clearing stones at the river bottom, meanwhile integrally assembling an inner cofferdam support structure on a barge at other place, and assembling a drilling platform; (2) floating the inner cofferdam support structure in place, inserting and striking steel pipe piles and pile foundation steel casings of the drilling platform, mounting a connection tie between the steel pipe piles and the pile foundation steel casings of the drilling platform, hoisting the inner cofferdam support structure out of the barge, and hoisting and placing the inner cofferdam support structure on the connection tie in temporary place; (3) lowing the inner cofferdam support structure in place, and inserting and striking a steel plate pile cofferdam; (4) hoisting the drilling platform to the pile foundation steel casings in place, and mounting a drill on the drilling platform to drill holes; and (5) underwater absorbing mud and cleaning silt for the inner cofferdam support structure, underwater leveling the foundation, and pouring underwater bottom sealing concrete. The construction method changes scattered construction into integral construction, changes over-water construction into shore construction, and changes streamline construction into synchronous construction.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a construction method of a bridge pier whose construction conditions are affected by external conditions such as construction work surfaces and flood seasons. Background technique [0002] At present, there are many construction methods for bridge pier construction, but conventional construction methods are generally only applicable to the situation where the construction work area is wide and the construction period is long. For the situation where the construction work area is narrow and the construction period is tight, the current conventional construction methods cannot meet the requirements: ①. Scattered construction requires a larger construction work area and a longer construction period; ②. Water construction requires a larger construction work ③, flow construction is less efficient and requires a longer construction period. [0003] In addition, in some cas...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D19/02
Inventor 陈世明蒋本俊林世发王远峰王贵羽刘生奇
Owner THE SECOND OF CHINA RAILWAY PORT CHANNEL ENG GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products