Method for performing construction operation on large-area ultra-soft soil site and steel frame system used by same
An ultra-soft soil and large-area technology, applied in the field of steel frame systems, can solve the problems of multiple construction procedures, non-recyclable utilization, and extended construction period, and achieve the effects of simple and fast construction operations, saving construction materials, and stable and safe operations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] The method for the construction operation of the present invention on the large-area ultra-soft soil site includes the following steps:
[0045] 1. Clean up the construction site and prepare for construction work.
[0046] 2. Lay a layer of geotextile on the construction site, generally woven geotextile is more appropriate.
[0047] 3. Lay a layer of two-way geogrid on the laid geotextile.
[0048] 4. Lay the steel frame system on the geogrid. If the bearing capacity of the site is sufficient and the subsidence of the lower steel pipe is not large, the following steel frame system 1 can be used, and the steel frame system construction can be carried out according to the following laying method:
[0049] The steel frame system used in the method of construction operation on a large-area ultra-soft soil site according to the present invention, the steel frame system 1 includes several first bottom steel pipes 9, several horizontal displacement limiting rings 10, several ...
Embodiment 2
[0081] The difference between the present invention and Embodiment 1 is that if the bearing capacity of the site is too low, causing the subsidence of the lower steel pipe to be too large, the following steel frame system 1 should be adopted. The steel frame system 1 includes several positioning steel pipes 13, positioning steel pipes Groove 14, several second bottom steel pipes 15, second bottom steel pipe grooves 16, several second top steel pipes 17, several positioning steel pipes 13 are laid in parallel, but not on a straight line, the positioning steel pipe grooves of positioning steel pipes 13 14 keeps facing upwards, several second bottom steel pipes 15 are laid on the laying direction perpendicular to the positioning steel pipe 13, and the second bottom steel pipe grooves at the two ends of the second bottom steel pipe 15 are facing downward, and snapped into the upper part of the positioning steel pipe 13. Position the steel pipe groove 14; several second top layer st...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com