Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Device, system, method and program of workability management, system, and picking truck

A management system and operation management technology, applied in the field of operational management procedures, can solve the problems of not being able to know the progress of the work in the work area, malfunctions, etc., and achieve the effect of easy progress and suppressed loss costs

Inactive Publication Date: 2008-12-10
HITACHI LTD
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, since the IC tag reading device reads all the IC tags located in the work area, it can read the IC tags for identification of operators necessary for work management and the traceability of components other than the IC tags for identification of work objects. There is a problem of misoperation due to a lot of information such as IC tags for management
In addition, the current situation is that it is impossible to know the progress of the work in the work area without analyzing the work information of the work equipment through the actual performance management CPU

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Device, system, method and program of workability management, system, and picking truck
  • Device, system, method and program of workability management, system, and picking truck
  • Device, system, method and program of workability management, system, and picking truck

Examples

Experimental program
Comparison scheme
Effect test

no. 1 Embodiment approach 》

[0118] figure 1 It is a configuration diagram showing the first embodiment of the work record collection system of the present invention. The operation performance collection system has: an ID tag 10 for determining the operation that is written with information for determining the operation content of the object to be operated; a work management box 20 with an input port 21 for putting the ID tag 10 into the operation for determination; The ID tag 10 for job identification is read on the side of the job management box 20 , and the read information is sent to the ID tag reading device 30 of the job performance management device 40 . Here, the content of the work is an assembling process of mounting the component 61 on the circuit board 60 as an example.

[0119] The work identification ID tag 10 is attached to the document of the instruction sheet 11 in which the work process is described using a non-contact wireless ID tag such as RFID (Radio frequency identification). The ...

no. 2 Embodiment approach 》

[0142] Figure 5 It is a configuration diagram showing a second embodiment of the work record collection system of the present invention. Figure 5 constituted as shown in the figure 1 Compared with the configuration shown in , an ID tag 80 for identifying an operator in which information for identifying an operator in the job management box 20 is written is added. The ID tag 80 for identifying the worker is attached to the employee ID card 81 of the worker, and is put in together with the instruction sheet 11 having the ID tag 10 for identifying the worker when the work starts. In addition, the following omits the same as figure 1 Explanation of the same part as in .

[0143] The ID tag reading device 30, when the employee ID card 81 is dropped into the operation management box 20, establishes communication with the ID tag 80 for operator identification, and then reads the operator ID card 81 added to the employee ID card 81. The information of the ID tag 80 is sent from ...

no. 3 Embodiment approach 》

[0148] Figure 7 It is a configuration diagram showing a third embodiment of the work record collection system of the present invention. Figure 7 constituted as shown in the Figure 5 Compared with the configuration shown in , an ID tag 90 for process identification 90 in which information for identifying the work process of the work target article in the work management box 20 is written is added. Figure 7 shown in Figure 5Further use the process identification ID tag 90 written with the information for identifying the operation process of the work target article, and use the job identification ID tag 10, the operator identification ID tag 80, and the process identification ID tag 90 at the same time. It is a method of collecting operation results by putting them into and taking them out from the work management box 20 . In addition, the following omits the same as Figure 5 Description of the same section in .

[0149] The ID tag 90 for process specification stores t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention aims at providing a work performance collection system for reliably collecting information of work performance without applying a burden to a worker in assembly of a work object article. This system includes a work specification ID tag (10) into which information for specifying a work content of a work object article is written, a work management box (20) having a throw-in port into which the work specification ID tag (10) is thrown at the time of work, and an ID tag reader (30) provided to a side surface of the work management box, for reading the work specification ID tag (10) and transmitting the read information to a work performance management apparatus (40). With such a structure, a worker is required to only throw the work specification ID tag (10) into the work management box at the start of work and to only take out the work specification ID tag (10) from the work management box at the end of work.

Description

[0001] This application is a divisional application, the application number of the original application is 200710110241.1, the application date is June 8, 2007, and the title of the invention is operation management device, picking trolley, operation management system, method and program. technical field [0002] The present invention relates to a work management device, a picking trolley, a work performance collection system, a redo measurement system, a work performance collection system, a workability management system, a redo measurement method, a work performance collection method, and a workability management method and operational management procedures. Background technique [0003] Conventionally, when collecting work results, a method of inputting work start and work end from a terminal or a wireless portable terminal of the work record collection system is generally used. However, in this method, the operator needs to interrupt the assembly operation to input the w...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B19/418G05B19/04G06K17/00
CPCY02P90/02
Inventor 大石聪新村米满濑谷裕之
Owner HITACHI LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products